Official reports, hearing transcripts, case files and releases: the paper behind the cases. 15,328 documents, 15,062 mirrored with their text, 223,615 pages indexed, so a search reads inside them and lands on the page.
p. 1UNCLASSIFIED
PROJECT TWINKLE
FINAL REPORT
L. ELTERMAN
27 November 1951
APPROVED:
P. H. WYCKOFF
Chief, Atmospheric Physics Laboratory
1. TWINKLE…
p. 2…Transmittal of Final Report of Project Twinkle
TO: Director of Research and Development
Headquarters, USAF
ATTN: AFDRU-RE, Colonel John…
p. 28(UNCLASSIFIED) Project TWINKLE
Directorate of Intelligence
Attention: Colonel John G. Ericksen, Chief
Technical Capabilities Branch
Research Division, Directorate of Research…
p. 1…Report of USAF Research Center, Cambridge, Mass., Investigation of "Green Fireball" Phenomena (Project TWINKLE).
6. Outline of Investigation of U…
p. 6…Oler gave a 40-minute briefing of Project TWINKLE, the investigatory project conducted by the Air Force Meteorological Research Center…
p. 18…With the poor results of the year-long Project TWINKLE program of 24-hour instrumentation watch (two frames of film…
p. 29…Report of USAF Research Center, Cambridge, Mass., Investigation of "Green Fireball" Phenomena (Project TWINKLE).
6. Outline of Investigation of U…
p. 12…With the poor results of the year-long Project TWINKLE program of 24-hour instrumentation watch (two frames of film…
p. 20…Report of USAF Research Center, Cambridge, Mass., Investigation of "Green Fireball" Phenomena (Project TWINKLE).
6. Outline of Investigation of UFO…
p. 7…Oder gave a 40-minute briefing of Project TWINKLE, the investigatory project conducted by the Air Force Meteorological Research Center…
p. 19…With the poor results of the year-long Project TWINKLE program of 24-hour instrumentation watch (two frames of film…
p. 30…Report of USAF Research Center, Cambridge, Mass., Investigation of “Green Fireball” Phenomena (Project TWINKLE).
6. Outline of Investigation of U…
p. 6…Oder gave a 40-minute briefing of Project TWINKLE, the investigatory project conducted by the Air Force Meteorological Research Center…
p. 18…With the poor results of the year-long Project TWINKLE program of 24-hour instrumentation watch (two frames of film…
p. 29…Report of USAF Research Center, Cambridge, Mass., Investigation of “Green Fireball” Phenomena (Project TWINKLE).
6. Outline of Investigation of U…
p. 8COPY
UNCLASSIFIED
UNCLASSIFIED
PROJECT TWINKLE
FINAL REPORT
L. ELTERMAN
27 November 1951
APPROVED:
P. H. WYCKOFF
Chief, Atmospheric Physics Laboratory…
p. 2COPY
UNCLASSIFIED
CONFIDENTIAL
UNCLASSIFIED
PROJECT TWINKLE
FINAL REPORT
L. ELTERMAN
27 November 1951
APPROVED:
P. H. WYCKOFF
Chief, Atmospheric Physics…
p. 4…Report of USAF Research Center, Cambridge, Mass., Investigation of "Green Fireball" Phenomena (Project TWINKLE).
6. Outline of Investigation of U…
p. 6…Report of USAF Research Center, Cambridge, Mass., Investigation of “Green Fireball” Phenomena (Project TWINKLE).
6. Outline of Investigation of U…
p. 4…Report of USAF Research Center, Cambridge, Mass., Investigation of "Green Fireball" Phenomena (Project TWINKLE).
6. Outline of Investigation of U…
p. 6…Ozer gave a 40-minute briefing of Project TWINKLE, the investigatory project conducted by the Air Force Meteorological Research Center…
p. 29…Report of USAF Research Center, Cambridge, Mass., Investigation of "Green Fireball" Phenomena (Project TWINKLE).
6. Outline of Investigation of U…
p. 5COPY
UNCLASSIFIED
CONFIDENTIAL
UNCLASSIFIED
PROJECT TWINKLE
FINAL REPORT
L. ELTERMAN
27 November 1951
APPROVED:
P. H. WYCKOFF
Chief, Atmospheric Physics…
p. 7COPY
UNCLASSIFIED
PROJECT TWINKLE
FINAL REPORT
L. ELTERMAN
27 November 1951
APPROVED:
P. H. WYCKOFF
Chief, Atmospheric Physics Laboratory
DOWNGRADED…
p. 4COPY
UNCLASSIFIED
UNCLASSIFIED
PROJECT TWINKLE
FINAL REPORT
L. ELTERMAN
27 November 1951
APPROVED:
P. H. WYCKOFF
Chief, Atmospheric Physics Laboratory…