Context
Box Tunnel runs 1.83 miles (2.95 km) through the hills between Bath and Chippenham, on the Great Western Main Line. It was built between December 1838 and June 1841 and opened on 30 June 1841. About 100 navvies died making it, mostly in blasting and from water coming in.