Documents / Report

The Roswell Report: Fact vs. Fiction in the New Mexico Desert

USAF / The Black Vault · 1995 · 882 pages · text by OCR, confidence 99%

No summary written yet.

G.M. 20 BALLOON G.M. 202 APPENDIX RIP RIGGING FLIGHT TERMINATION SWITCH PAYLOAD PARACHUTE ML-132 BANNER - 3' x 6' ORIFICE BALLAST ASSEMBLY 1500 gm Ft. SWITCH 500 » RIGGING 2500 » PAYLOAD 500 » DRAG & BANNER 500 » RESERVOIR 1500 » BALLAST 7000 gm NET 4500 » BALLOON 11500 gm GROSS NOTE: CEILING - 59000 to 63000 ft. All rigging 500 lb. test Nylon 2 Full Tanks Helium Req'd Prob. Flight Dur. - 10 hrs. LAUNCHING REMNANT FIG. 16 NYU BALLOON PROJECT PROPOSED FLIGHT TRAINS FOR SERVICE FLIGHTS (COMPLETE) DWN. BY: L.H.M DATE: 8-31-48 FT 48-X1 -30-

Cited by

Cases discussed

About this file

Report, cited by the archive. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model (mean confidence 99%); expect the odd misread word. 882 pages are in the text index: search them above, or from the library's search.