Documents / Report

The Roswell Report: Fact vs. Fiction in the New Mexico Desert

USAF / The Black Vault · 1995 · 882 pages · text by OCR, confidence 99%

No summary written yet.

PEN ARM IS ON SHELF UNTIL BALLOON RISES ABOVE 25,000 FT. WHERE IT FALLS ON TO THE COMMUTATOR. WHEN THE BALLOON DESCENDS THE PEN ARM RIDES DOWN ON COMMUTATOR UNDER THE SHELF, CLOSING THE CIRCUIT AT 20,000 FT. SHELF DETAIL 3/32" BRASS WIRE 1/4" 1/8" 1/4" 1/16" SILVER SOLDER 2-56 NF PEN ARM SHELF COMMUTATOR OPEN ABOVE 45TH CONTACT Nº2 SHAKEPROOF LOCK WASHERS UNDER TOP AND BOTTOM NUTS ANEROID CELL 12" WIRE LEADS—20 GAGE STRANDED WIRE LINKAGE DETAIL BRACKET HOLDS PEN ARM CAPTIVE CIRCUIT CLOSES ON DESCENT TO 20000' STANDARD ATMOSPHERE TO SQUIB CANNON FIG. 12 NYU BALLOON PROJECT FLIGHT TERMINATION SWITCH DATE 7-27-48 ED48-70A NOTE: MFD BY KOLLSMAN -24-

Cited by

Cases discussed

About this file

Report, cited by the archive. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model (mean confidence 99%); expect the odd misread word. 882 pages are in the text index: search them above, or from the library's search.