Documents / Report

The Roswell Report: Fact vs. Fiction in the New Mexico Desert

USAF / The Black Vault · 1995 · 882 pages · text by OCR, confidence 99%

No summary written yet.

Date of Correspondence Address Abstract Answer 6/16/47 Mr. F. M. Cooper 959 Whittier Ave. Akron 2, Ohio Specification of large balloon sent and appointment requested to discuss manufacture Considering problem before mailing bid. 6/19/47 Contracting Officer, Watson Laboratories Red Bank, N. J. Enclosing copies of Special Report #1 None required. 6/19/47 Mr. Douglas Rigney Watson Laboratories Red Bank, N. J. Request for additional Army weather equipment Being procured. 6/25/47 Chief of U. S. Weather Bureau Washington 25, D. C. Att: Mr. B. C. Haynes Request for Big Springs radio-sonde station to monitor Alamo-gordo flights Active cooperation received. 6/25/47 Kollaman Instrument Div. Square D Company Elmhurst, M. Y. Att: Mr. Paul Goudy Order to modify dribble mounting and rate of flow. Complied with. 6/24/47 WIRE Mr. O. C. Winsem General Mills Minneapolis, Minn. Request 7 foot balloons have means of attaching shroud lines to carry load. Complied with. 6/26/47 Mr. O. C. Winsem General Mills Minneapolis, Minn. Order to ship remaining 7-foot balloons to El Paso. Request for estimate on ballast gripping devices. Complied with. General Mills awaiting ballast sample.

Cited by

Cases discussed

About this file

Report, cited by the archive. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model (mean confidence 99%); expect the odd misread word. 882 pages are in the text index: search them above, or from the library's search.