3/25/47
Lt. Gunther, Comdr.
Harrison, C. Ireland,
Moore
Lakehurst Air Naval Station
Lakehurst, N. J.
Use of Lakehurst as a launching site.
Lakehurst would be available to Watson.
3/26/47
F. Seyfang, Mrs. F. Seyfang, Moore, Schneider
Atlantic City, N. J.
Seyfang Laboratories
Fabrication of large balloons.
A quotation would be prepared.
4/4/47
Dr. Peoples, D. Higney, Moore, Schneider
Watson Laboratories
Red Bank, N. J.
1st Cluster Flight
Prepare for Second Flight
4/11/47
R. Brophy, Mr. Cambridge
R. Contini, M. Giannini
Schneider, Moore
New York University
Contract Administration
Housing would be provided by Govt.
4/30/47
P. Goudy, Moore
Kollsmann Instrument Co.
Elmhurst, L. I.
Ballast valve construction.
During the period covered by this report, Messrs. Moore and Schneider made repeated trips to Kollsmann Instrument Co. and discussed the fabrication of the modulators and other equipment that Kollsmann was designing for our use. These meetings have not been considered conferences but for the benefit of this report the same individuals were always present, Messrs. Schneider and Moore of New York University and Paul Goudy, Engineer for Kollsmann Instrument Co. The material discussed was methods of improving the construction of the modulators and other equipment.
- 16 -