Documents / Document

STS-75 press kit

NASA · 40 pages · text from the file's own layer

This is NASA's press kit for Space Shuttle mission STS-75, dated February 1996 and later edited by Richard W. Orloff. It covers Columbia's planned 13-day flight carrying the Italian Tethered Satellite System reflight (TSS-1R) and the third United States Microgravity Payload. The kit sets out launch and landing plans, abort modes, the timeline, payload weights, crew duties, the tether's science objectives and investigators, and crew biographies. It does not mention any unidentified objects.

  • p. 1 …Orloff, 01/2001/Page 1 NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE SHUTTLE MISSION STS-75 PRESS…
  • p. 2 …Orloff, 01/2001/Page 2 STS-75 INSIGNIA STS075-S-001 -- The STS-75 insignia depicts…
  • p. 3 …Information 805/258-3448 For Information on STS-75 Experiments & Activities Jerry Berg Marshall Space Flight…
  • p. 4 …12 Crew Responsibilities 13 STS-75 PAYLOADS & ACTIVITIES Science Aboard STS-75 14 Tethered Satellite System…
  • p. 5 …96-27 REFLIGHT OF TETHERED SATELLITE HIGHLIGHTS STS-75 NASA's second Shuttle mission of the…
  • p. 6 …Internet Information The NASA Headquarters Public Affairs Internet Home Page provides access to the STS-75…
  • p. 7 …Orloff, 01/2001/Page 7 STS-75 QUICK LOOK FACTS Launch Date/Site: February 22, 1996…
  • p. 9 …Abort modes for STS-75 include: • Abort-To-Orbit (ATO) -- Partial loss of main engine thrust…
  • p. 11 …Orloff, 01/2001/Page 11 STS-75 ORBITAL EVENTS SUMMARY (Based on a Feb. 22, 1996…
  • p. 14 …Orloff, 01/2001/Page 14 SCIENCE ABOARD STS-75 Science aboard STS-75 comes in two…
  • p. 16 …During the second day on orbit, the STS-75 crew will reel the satellite out on…
  • p. 27 …Orloff, 01/2001/Page 27 COMMERCIAL PROTEIN CRYSTAL GROWTH (CPCG) STS-75 includes a flight of…
  • p. 30 …Orloff, 01/2001/Page 30 STS-75 CREWMEMBERS STS075-S-002 -- With their major payload as…
  • p. 31 …Allen is assigned to command the STS-75 mission, a 13-day flight scheduled for launch…
  • p. 39 …Guidoni is currently assigned as payload specialist on the STS-75, Tethered Satellite System Reflight (TSS…
Edited by Richard W. Orloff, 01/2001/Page 9
SHUTTLE ABORT MODES
Space Shuttle launch abort philosophy aims toward safe and intact recovery of the flight crew, orbiter and
its payload. Abort modes for STS-75 include:
• Abort-To-Orbit (ATO) -- Partial loss of main engine thrust late enough to permit reaching a minimal
105-nautical mile orbit with the orbital maneuvering system engines.
• Abort-Once-Around (AOA) -- Earlier main engine shutdown with the capability to allow one orbit of
the Earth before landing at the Kennedy Space Center, FL.
• Transoceanic Abort Landing (TAL) -- Loss of one or more main engines midway through powered
flight would force a landing at either Ben Guerir, Morocco; or Moron, Spain.
• Return-To-Launch-Site (RTLS) -- Early shutdown of one or more engines, and without enough energy
to reach a TAL site, would result in a pitch around and thrust back toward KSC until within gliding
distance of the Shuttle Landing Facility.

About this file

Document, cited by the archive. The PDF is mirrored here; the original link is under it. 40 pages are in the text index: search them above, or from the library's search.