Documents / Document

STS-75 press kit

NASA · 40 pages · text from the file's own layer

This is NASA's press kit for Space Shuttle mission STS-75, dated February 1996 and later edited by Richard W. Orloff. It covers Columbia's planned 13-day flight carrying the Italian Tethered Satellite System reflight (TSS-1R) and the third United States Microgravity Payload. The kit sets out launch and landing plans, abort modes, the timeline, payload weights, crew duties, the tether's science objectives and investigators, and crew biographies. It does not mention any unidentified objects.

  • p. 2 …The Orbiter/satellite system is passing through the Earth's magnetic field which, like an electric…
  • p. 5 …on orbiting platforms such as the international Space Station. Deploying a tether towards Earth could place…
  • p. 9 …with the capability to allow one orbit of the Earth before landing at the Kennedy Space…
  • p. 15 …Also, a satellite could be moved up and down in orbit by releasing a tethered body…
  • p. 16 …Orloff, 01/2001/Page 16 Earth's Charged-Particle Environment and the Tethered Satellite System TSS…
  • p. 17 …The Research on Orbital Plasma Electrodynamics experiment, by Dr. Nobie Stone of Marshall, will study the…
  • p. 19 …The orbital dynamics will result in the Tethered Satellite initially being deployed upward but at an…
  • p. 22 …The effects of gravity on the orbiting spacecraft are roughly a million times less than experienced…
  • p. 23 …The orbital environment will permit measurements to be made within a few millionths of a degree…
  • p. 24 …Materials for the Study of Interesting Phenomena of Solidification on Earth and in Orbit (MEPHISTO) Principal…
  • p. 26 …that may occur on orbit. When a fire starts on Earth, flames spread due to the…
Edited by Richard W. Orloff, 01/2001/Page 9
SHUTTLE ABORT MODES
Space Shuttle launch abort philosophy aims toward safe and intact recovery of the flight crew, orbiter and
its payload. Abort modes for STS-75 include:
• Abort-To-Orbit (ATO) -- Partial loss of main engine thrust late enough to permit reaching a minimal
105-nautical mile orbit with the orbital maneuvering system engines.
• Abort-Once-Around (AOA) -- Earlier main engine shutdown with the capability to allow one orbit of
the Earth before landing at the Kennedy Space Center, FL.
• Transoceanic Abort Landing (TAL) -- Loss of one or more main engines midway through powered
flight would force a landing at either Ben Guerir, Morocco; or Moron, Spain.
• Return-To-Launch-Site (RTLS) -- Early shutdown of one or more engines, and without enough energy
to reach a TAL site, would result in a pitch around and thrust back toward KSC until within gliding
distance of the Shuttle Landing Facility.

About this file

Document, cited by the archive. The PDF is mirrored here; the original link is under it. 40 pages are in the text index: search them above, or from the library's search.