Documents / Document

STS-75 press kit

NASA · 40 pages · text from the file's own layer

This is NASA's press kit for Space Shuttle mission STS-75, dated February 1996 and later edited by Richard W. Orloff. It covers Columbia's planned 13-day flight carrying the Italian Tethered Satellite System reflight (TSS-1R) and the third United States Microgravity Payload. The kit sets out launch and landing plans, abort modes, the timeline, payload weights, crew duties, the tether's science objectives and investigators, and crew biographies. It does not mention any unidentified objects.

  • p. 2 …The NASA insignia design for space shuttle flights is reserved for use by the astronauts and…
  • p. 3 …Ed Campion Policy/Management 202/358-1778 NASA Headquarters Washington, DC Rob Navias Johnson Space Center…
  • p. 5 …96-27 REFLIGHT OF TETHERED SATELLITE HIGHLIGHTS STS-75 NASA's second Shuttle mission of the…
  • p. 6 …Orloff, 01/2001/Page 6 MEDIA SERVICES INFORMATION NASA Television Transmission NASA television is available through…
  • p. 15 …Orloff, 01/2001/Page 15 TETHERED SATELLITE SYSTEM REFLIGHT (TSS-1R) NASA and ASI long have…
  • p. 16 …Scientific Investigations Of the TSS-1R mission's 12 scientific investigations, NASA will provide six, ASI…
  • p. 18 …Manager Mike Calabrese, Office of Space Science, NASA Headquarters, Washington, DC. Responsible for project management at…
  • p. 22 …Fripp, NASA Langley Research Center, Langley, VA Objective. The speed and the amount of information that…
  • p. 24 …The investigation known as MEPHISTO is a cooperative program between NASA, the French Space Agency and…
  • p. 25 …Richard DeLombard, NASA Lewis Research Center, Cleveland, OH Objective. When the Space Shuttle is in orbit…
  • p. 26 …Sacksteder, NASA Lewis Research Center, Cleveland, OH Objective. On Earth, gravity causes air motion known as…
  • p. 27 …which was formed in 1985 as a NASA Center for the Commercial Development of Space. The…
  • p. 30 …It may not be used to state or imply the endorsement by NASA or by any…
  • p. 31 …Allen (Lieutenant Colonel, USMC) NASA Astronaut BIRTHPLACE AND DATE: Born August 4, 1955, in Philadelphia, PA…
  • p. 32 …Selected by NASA in March 1992, Scott reported to the Johnson Space Center in August 1992…
  • p. 33 …Hoffman was awarded NASA Space Flight Medals in 1985, 1991, 1992 and 1994, NASA Exceptional Service…
  • p. 34 …Satellite System (TSS), a joint project between NASA and the Italian Space Agency. Dr. Hoffman had…
  • p. 35 …Lieutenant Colonel in the Italian Air Force. NASA EXPERIENCE: Cheli reported to the Johnson Space Center…
  • p. 36 …Under agreement between ESA and NASA he joined the NASA astronaut candidates selected in May 1980…
  • p. 37 …Chang-Diaz (Ph.D.) NASA Astronaut BIRTHPLACE AND DATE: Born April 5, 1950, in San Jose…
  • p. 38 …Orloff, 01/2001/Page 38 NASA EXPERIENCE: Selected by NASA in May 1980, Dr. Chang- Diaz…
  • p. 39 …In 1991 he was relocated to the NASA Johnson Space Center to follow the training for…
Edited by Richard W. Orloff, 01/2001/Page 18
TSS-1R Mission Management
TSS-1R is directed by Program Manager Tom Stuart, Office of Space Flight, and Science Payload Program
Manager Mike Calabrese, Office of Space Science, NASA Headquarters, Washington, DC. Responsible
for project management at Marshall are Mission Manager Robert McBrayer and Mission Scientist Dr.
Nobie Stone, who also serves as project scientist and co-chairman of the Investigator Working Group. The
chief engineer is Tony Lavoie.
At the Italian Space Agency, Rome, Italy's TSS-1R contribution is directed by ASI Program Manager Dr.
Carlo Bonifazi, also the ASI Science Program Manager. Responsible for the Project Management of the
satellite and the Core Equipment are, respectively, Raffaele Battaglia and Francesco Svelto. Dr. Marino
Dobrowolny is ASI Mission Scientist, with his assistant Dr. Jean Sabbagh.

About this file

Document, cited by the archive. The PDF is mirrored here; the original link is under it. 40 pages are in the text index: search them above, or from the library's search.