Documents / Document
STS-75 press kit
NASA · 40 pages · text from the file's own layer
This is NASA's press kit for Space Shuttle mission STS-75, dated February 1996 and later edited by Richard W. Orloff. It covers Columbia's planned 13-day flight carrying the Italian Tethered Satellite System reflight (TSS-1R) and the third United States Microgravity Payload. The kit sets out launch and landing plans, abort modes, the timeline, payload weights, crew duties, the tether's science objectives and investigators, and crew biographies. It does not mention any unidentified objects.
“STS-75”15 pages
- p. 1 …Orloff, 01/2001/Page 1
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
SPACE SHUTTLE
MISSION
STS-75 PRESS…
- p. 2 …Orloff, 01/2001/Page 2
STS-75 INSIGNIA
STS075-S-001 -- The STS-75 insignia depicts…
- p. 3 …Information 805/258-3448
For Information on STS-75 Experiments & Activities
Jerry Berg
Marshall Space Flight…
- p. 4 …12
Crew Responsibilities 13
STS-75 PAYLOADS & ACTIVITIES
Science Aboard STS-75 14
Tethered Satellite System…
- p. 5 …96-27
REFLIGHT OF TETHERED SATELLITE HIGHLIGHTS STS-75
NASA's second Shuttle mission of the…
- p. 6 …Internet Information
The NASA Headquarters Public Affairs Internet Home Page provides access to the STS-75…
- p. 7 …Orloff, 01/2001/Page 7
STS-75 QUICK LOOK FACTS
Launch Date/Site: February 22, 1996…
- p. 9 …Abort modes for STS-75 include:
• Abort-To-Orbit (ATO) -- Partial loss of main engine thrust…
- p. 11 …Orloff, 01/2001/Page 11
STS-75 ORBITAL EVENTS SUMMARY
(Based on a Feb. 22, 1996…
- p. 14 …Orloff, 01/2001/Page 14
SCIENCE ABOARD STS-75
Science aboard STS-75 comes in two…
- p. 16 …During
the second day on orbit, the STS-75 crew will reel the satellite out on…
- p. 27 …Orloff, 01/2001/Page 27
COMMERCIAL PROTEIN CRYSTAL GROWTH (CPCG)
STS-75 includes a flight of…
- p. 30 …Orloff, 01/2001/Page 30
STS-75 CREWMEMBERS
STS075-S-002 -- With their major payload as…
- p. 31 …Allen is
assigned to command the STS-75 mission, a 13-day flight scheduled for launch…
- p. 39 …Guidoni is currently assigned as payload specialist on the STS-75, Tethered Satellite System Reflight
(TSS…
Edited by Richard W. Orloff, 01/2001/Page 10
MISSION SUMMARY TIMELINE
Flight Day 1
Launch/Ascent
TSS Checkout and Activation
USMP-3 Activation.
Flight Day 2
TSS Pre-Deploy Checkout
USMP-3 Operations.
Flight Day 3
TSS Flyaway
USMP-3 Operations.
Flight Day 4
TSS Science Operations and Retrieval
USMP-3 Operations.
Flight Day 5
TSS Retrieval and Docking
TSS Post- Retrieval Safing
USMP-3 Operations.
Flight Day 6
Middeck Glovebox Setup.
Flight Day 7-12
USMP-3 Operations.
Flight Day 13
USMP-3 Operations
Crew News Conference.
Flight Day 14
Flight Control System Checkout
Reaction Control System Hot-Fire
USMP-3 Deactivation
Cabin Stow.
Flight Day 15
Deorbit Prep
Deorbit Burn
Entry
KSC Landing.
About this file
Document, cited by the archive. The PDF is mirrored here; the original link is under it. 40 pages are in the text index: search them above, or from the library's search.