Documents / Report

Project Twinkle Final Report (scan)

NICAP · 29 pages · text by OCR

This declassified U.S. Air Force file contains the final report of Project Twinkle, dated 27 November 1951 and written by Louis Elterman of the Geophysics Research Division, together with related correspondence. The project was set up to investigate the green fireballs and other light phenomena around Holloman AFB and Vaughn, New Mexico, and it was run with Askania cameras. The report calls its findings essentially negative and recommends no further funding. In March 1952 the Directorate of Intelligence declined to declassify it.

  • p. 1 …TWINKLE, Project DOWNGRADED AT 8 YEAR INTERVALS: DECLASSIFIED AFTER 12 YEARS. DOD DIR 5200,10. UNCLASSIFIED
  • p. 2 …Geophysics Research Division DOWNGRADED AT 3 YEAR INTERVALS; DECLASSIFIED AFTER 12 YEARS. DOD DIR 5200.10
  • p. 3 …sharp eye on anything unusual along this line. DECLASSIFIED AFTER 12 YEARS. DOD DIR 5200.10
  • p. 4 …UNCLASSIFIED DOWNGRADED AT 3 YEAR INTERVALS DECLASSIFIED AFTER OWNGRADED AT 3 YEAR INTERVALS DECLASSIFIED AFTER 12…
  • p. 7 …LOW GRADED AT 3 YEAR INTERVAL DECLASSIFIED AFTER 12 YEARS. DOD DIR 5200.10
  • p. 8 …few reports of DOWNGRADED AT 3 YEAR INTERVAL DECLASSIFIED AFTER 12 YEARS. DOD DIR 5200.10
  • p. 9 …DOWNGRADED AT 3 YEAR INTERVALS DECLASSIFIED AFTER 12 YEARS. DOD DIR 5200.10 CONFIDENTIAL 6 UNCLASSIFIED
  • p. 12 …CONFIDENTIAL UNCLASSIFIED DOWNGRADED AT 3 YEAR INTERVAL DECLASSIFIED AFTER 12 YEARS. DOD DIR 6200.10
  • p. 14 …Geophysics Research Division DOWNGRADED AT 3 YEAR INTERVALS: DECLASSIFIED AFTER 12 YEARS. DOD DIR 5200.10
  • p. 19 …Field Test Director DOWNGRADED AT 3 YEAR INTERVALS DECLASSIFIED AFTER 12 YEARS. DOD DIR 5200.10
  • p. 21 …1b abv DOWNGRADED AT 3 YEAR INTERVAI DECLASSIFIED AFTER 12 YEARS. DOQ DIR 6200.10 Copy…
  • p. 22 …DOWNGRADED AT 2 YEAR INTERVAL DECLASSIFIED AFTER 12 YEARS. DQD DIR E200.10
  • p. 23 …USAF enclosure 2 DOWNGRADED AT 3 YEAR INTERVALS: DECLASSIFIED AFTER 12 YEARS. DOD DID 5200.10
  • p. 24 …Basic Letter DOWNGRADED AT 3 YEAR INTERVALS: DECLASSIFIED AFTER 12 YEARS. DOD DIR 5200.10 UNCLASSIFIED
  • p. 26 …Research and Development DOWNGRADED AT 8 YEAR INTERVALS: DECLASSIFIED AFTER 12 YEARS. DOD DIR 5200.10
  • p. 28 …The Scientific Advisory Board Secretariat has suggested that this project not be declassified for a variety…
  • p. 29 …It is not considered appropriate to declassify the project at this time since no definite conclusions…
## UNCLASSIFIED

(1) No further fiscal expenditure be made in pursuing the problem. This opinion is prompted partly by the fruitless expenditure during the past year, the uncertainty of existence of unexplainable aerial objects, and by the inactive position currently taken by Holloman AFB as indicated by the "stand-by status" of the project. The arrangements by HAFB for continued vigilance by Land-Air, the weather station as well as the briefing of pilots on the problem in part relieves the need for a systematic instrumentation program.

(2) Within the next few months, Dr. Whipple will have completed the installation of two 18-inch Schmidt cameras for meteor studies. The cameras will be stationed about 20 miles apart in the vicinity of Las Cruces, New Mexico. Since these studies will be sponsored by the GRD, arrangements can be made for examining the film for evidence of aerial object phenomena.

LOUIS ELTERMAN Project Scientist Atmospheric Physics Laboratory Geophysics Research Division

DOWNGRADED AT 3 YEAR INTERVALS: DECLASSIFIED AFTER 12 YEARS. DOD DIR 5200.10

About this file

Report, cited by the archive. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 29 pages are in the text index: search them above, or from the library's search.