Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 43 …to the sun for only a few days. The plasticizers and antioxidants in the neoprene would…
  • p. 205 …ashes after exposure to the sun for only a few days. The balloon material and radar…
  • p. 221 …to the sun. Q: Is this the neoprene type or the ••• A: That's the neoprene…
  • p. 230 …such as the balloon material degraded, and maybe fused in the hot sun? 14 A: I…
  • p. 282 …We worked in the old Sun newspaper building in downtown Baltimore. Q: They had intelligence personnel…
  • p. 465 …the values of superheat ob- tained by the gas when the balloon is in the sun…
  • p. 484 …Superheat and Its Effects The effect of the heatin~ of lifting gas by the sun's…
  • p. 489 …Since the effect of the sun in heating the lifting gas decreases the effect of different…
  • p. 524 …when the ex- ternal temperature was measured, since no adequate protection from the sun was available…
  • p. 525 …Daytime flights had the added advantage or heating from the sun. The temperature of the lifting…
  • p. 541 …in the aneroid val~e as intermittent clouds shut off' the sun, and (3) the overcompensation…
  • p. 547 …stmset, and the balloon took on superheat whioh was lost_when the sun went down. ntis…
  • p. 558 …the transmitter was not insulated, and there was no heat to be gained .from the sun…
  • p. 570 …Since the sun had set between the third and -40-
  • p. 579 during the sunset descent (caused when the superheated helium lost the sun's heating ei'i…
  • p. 591 …that seen earlier with the balloon gas being warmed by the sun to acquire a superheat…
  • p. 666 …the changing buoyancy of the balloon as cloud masses intermittently shielded it from the sun's…
  • p. 736 …the subst;q.uent descent, superheating of the balloons by the nsmg sun would cause the…
  • p. 739 …Flight termination was usually due to deteriora- tion of the balloon caused by the sun. In…
  • p. 740 …the ambient tem- perature after the sun had risen. The automatic ballast valve operates. when the…
  • p. 801 …April 14 Sun. Down to lab this am with Joe looking for G9A files. Jim Peoples…
  • p. 802 …Discussed with Crane possibilities of getting sound through the ground part of the ocean sound channel…
  • p. 803 …Over to Jim and Rowes tonight and to Euzzards Bay bowling, l'ay 5 Sun. L…
  • p. 806 …Stayed at Amarillo - at Clinton Hotel Jan 19 Sun Left Amarillo about 1130 CST IC.ent…
  • p. 808 …Correlated between the ~ower and Dona sites for se·reral sources. 'o!orked total travel times…
  • p. 810 …April 6 Sun. Checked clocks. Cleaned out hanger and emptied trash out at East White Sands…
  • p. 811 …April 20 Sun. Worked on plans for bombing runs and V2 monitoring. April 21 Mon. Alamogordo…
  • p. 812 …All equipment loaded on plane this pm. ~ay J-4 Sat, Sun. Left Alamogordo about 9…
  • p. 815 …29 June (Sun) NYU personnel and some of Watson Lab men working today with equipment in…
  • p. 816 …July 1a Sun. to cabins in Ohio just out of Springfield. July 1 Mon. To cabins…
  • p. 852 …4C.~~~ies• .tJi~J.tl~e ..• a 'telemeteririg ·device to indicate· the rate of ballast flow…
  • p. 861 …a sun- set. (3) By adding altitude control equipment, it is possible to maintain the balloon…
1~7 7
March 31 Monday. Alamogordo. Chantz, Bill Godbee and Ace went out to E. White Sands and
Tularosa sites to make final setups. Sal, Edmondson, Peoples amd I went out to Dona site
this pm and moved tent and Rubicon to #3 position and set up low frequency apparatus
April 1 Tues V2 Rocket #22 went off at 1310 this pm. Chantz and Don at Tularosa, Godbee
and Peoples at East White Sands, Sal and Edmondson at Dona, Porter and I at Lucero. All
4 stations got good recordings though low frequency instrument at Dona did not work out.
April 2 Wed. Peoples, Major Magnur?, Thompson and myself went over to Lt Col:·McKenson's
office this am regarding bombing ~uns~ There are many difficulties with the bombing here,
mostly that so many new groups have moved in and are setting up on the northern? range.
Thompson and I went overto see Major Mitchell this pm regarding same matter. Wrote memo
regarding proposed work to take to CO tomorrow. Peoples left on B-17 today. Don and Bill G
went to Dona and Launching Area sites am and got all loose wires. Don and Bill E went to
East White Sands and Tularosa pm and got inventory and brought back Rubicon and tent from
Tularosa. \forked on East Hhite Sands record. V2 made 8 5 peaks - down course. Porter worked
on calculations pm. Sal and Edmondson took complete inventory and this pm worked on low
frequency equipment.
April J Thurs. Oliva and Edmondton on low frequency equipment. All T-21s changed over to
Stds. Edmonton and Bill G went out to Lucero and Dona, got inventory and brought back
tent from Lucero.
April 4 Fri~ Reynolds and I went out to Osurso? Range and located PB1 bombing range. Set
up wires and did surveying. Chantz and Porter on computations April 1
April 5 Sat Alamogordo.
April 6 Sun. Checked clocks. Cleaned out hanger and emptied trash out at East White Sands
April 7 Mon Talked to Pritchard re )rd car for tomorrow. Gave him memo of progress report
for MOGUL project to date, talked to Lt Dyer of Signal Corps regarding for tomorrow
firing. Chantz and Bill went out to Tularosa and got that site ready. All equipment checked
for tomorrow. Edmondston and Reynolds ran drum recording of McCurdy low frequency equip-
ment at base. Porter and I worked on amplitudes and frequencys of all recordings April 1
firing and started calculations. Olive worked on calibration of GR8 recorder attenuation.
Got 3rd vehicle and all trip tickets for tomorrow.
April 8 Tues. Ace and I went out 7 am to Osarco site. Arrived 9 and set up radio and T-21s.
Rocket due at 11, delayed until 1710. Very windy then, all settings at 8. Ran J rolls but
nothing came in. Chantz at Tulerosa alone - Godbee and Reynolds at East ~fhite Sands - Oliva
and Edmonston at Dona - all sites windy but J closest ones got some signals.
April 9 Wed. Worked on yesterday's records. Made picks on Dona, East White Sands and Tularos;
Found nothing on Oscuro site recordings. Don and Bill G went out to East White Sands site
and took recordings with pistonphone to get GRJ attenuation calibration. Sal Olive left this
pm for San Diego. Wrote letters to Vivian and Jim p tonight.
April 10 Thurs. Ace and Phil worked on rocket recordings. - azimuths vs elevation angles.
Don-.and I went out to Tulaarosa Range and checked bombing sites - bombing range just north
of Range Camp and another site between that and our Tularosa site. Triangulated in with
Tularoas Peak, etc·. Thompson left in 45 for East. Godbee and Edmondson went with him.
April 11 Fri. Don and I went out past Tularosa Site looking for bombing sites. Went back
to Air to Ground Range and to air strip. Chantz and Porter working on calculations V2 23
and T-21 calibrations.
April 12 Sat_. Alamogordo Air Base
April 13 Sun. ~orked on formula for triangulation without using compass - Alamogordo Air Bas
April 14 Mnn: Porter, Chantz and I worked on GRJ and GR8 calibration curves for frequency
and attenuation settings. Don worked around equipment - Don, Ace and Bill got apartments
at air base. Wrote letters to Vivian and Eileen tonight.
April 15 Tues Alamogordo. B-29 arrived today - Lt Ball, McCurdy, Woodruff and MOGUL pers-
onnel - 41493: Lewis, Wolk, Burnhoff, Adams, Duff • Worked some on instrument calibrations.
Lewis, Ball and I checked with Major Pritchard, then to Major Mitchell's office regarding
bombing sites. Mitchell said CO had turned down bombing from air, but we could have surface
charges along Tularosa road. \·lent up in AT-6, light plane with Capt Runcraft and looked over
area west of Tularosa as far as the mountains, where bombing sites are to be located.
April 16 Wed. Alamogordo. Chantz and Reynolds out to East White Sands and Tularosa sites
to check GRJ equipment for tomorrow. Porter and McCurdy working on low frequency equipment
for '!2 tomorrow. 1o/oodruff, Ball, Work and I went out to Dona site then to Launching Area
site. Strung out wires and left equipment for tomorrow's firing. McCurdy working tonight
on low freq. Oliva in from San Diego this pm

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.