The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 36 …potential existence of such records within DOE channels, however. An Extraterrestrial Craft The Air Force research…
  • p. 81 …is not normally released outside Air Force channels. It does not cover the investigation of air…
  • p. 214 …Some of the reflectors were procured from sources out of normal channels. Some of the contractors…
  • p. 236 …try to put microphones into the sound channel. During WWII, the ·signal Corps had laid on…
  • p. 240 …I knew, just being an atmospheric physicist, I knew about the sound duct channel and I…
  • p. 273 …the sound waves operating in the sound channel in the stratosphere. The constant level balloon was…
  • p. 279 COL TRAKOWSKI - 6/29/94 7 were out of channel, so to speak. It was on…
  • p. 319 …II, studying, among other things, the "sound channel" in the ocean. He proved that explosions could…
  • p. 399 …Tb1e situation 1s~escr1beo a• a sound channel .. 1tb 1t& axis at 4000 feet, because all…
  • p. 400 …that there is a s1~1lar sound channel 1n the atmosphere with the axis at a…
  • p. 401 …red height withqut prohibit1'Ye eacr1t1ce ot sound channel prooertiea. Hawcner, 1~ the aub:a.rine…
  • p. 402 …cted at tbe axis ot the sound channel ahould be made. In·., op1n1oii', the J)r1nc1…
  • p. 403 …toe ~trato::.;;he:r·a so\,;nd channel ~!:lould be 1r.ves:.:1. 0ated, for it…
  • p. 407 …compressional waves are generated in the sound channel existing between 50,000 and 701000 feet (such…
  • p. 432 …ratio) and simultaneous transmission of several data channels at one frequency. This project was abandoned before…
  • p. 434 …The recorder used was a Brush BL-202 dottble channel oscillograph. A. quarter wave vertical receiVing…
  • p. 525 …To permit the transmission of both temperature and pressure data by one radio channel, a pe…
  • p. 671 …her than pressure is also to be transmitted on the same radio channel, the pressure - 33 -
  • p. 802 …Discussed with Crane possibilities of getting sound through the ground part of the ocean sound channel…
  • p. 980 …It was Ewing who first conceptualized the military significance of the atmospheric sound channel. His proposal…
1~7 6
~·a.rcr 9 c:un. Left Olmsted 0934 am - c47, Manjak and Schneider and landed at Newark 1130
~hompson and I took train to Asbury Park from Pa station. In Asbury Park 3 pm
March 10 Mon Oakhurst. Vivian and I worked on Flight 25, Parts 1 and 2. Started Eileen
on V-2 rocket ~ecordings.
~arch 11 Tues Oakhurst. Vivian and I worked on Flights 25, 24. Flight 26 off today, Part
1 at 9, part 2 at 2 pm. Good results! Eileen on V2 rocket March 7, Dona Site.
March 12 Wed Oakhurst. Vivian and I worked on records - Flight 26, and started Flight 23.
Eileen worked on Dona site , V-2. Thompson and I went over Alamogordo plans.
March 1J lhurs Oakhurst. Worked with Vivian some on Flight 23 and 22. Worked on Tularosa
site of V2 - 7 March. Eileen worked on Launching Site, V-2. Flight 27 today - at 12 noon
and at 4 pm. Probably last of flights.
March 14 Fri Oakhurst. Vivian worked on identification of returns, last~~=5 cruises. gave
good sky waves. Trakowski, Peoples and myselfwrote up report for General Reves on overall
program to be hand carried by Thompson to Washington. Eileen worked on V-2 records, #21
March 15 Sat Oakhurst. Worked up survey of Launching .irea and Tuleroso sites lc plotted all
sites on air map. Worked on V2 rocket March 7 records.
March 16 Sun Oakhurst. Worked· on fon~ula for amnnd correction un.:t.il 2 p11 - went over to
McCurdys tonight.
March 17 Mon Oakhurst. Vivian plotted up all last sky waves. Worked on eqpt list for Alamo-
gordo. Worked on formulas for wind correction. , , ,
March 18 Tues Oakhurst. Worked with V. Checked through all March 13 records.,. Worked on
Woods Hole recordings pm. Eileen working on V-2 rockets.
March 19 Wed Oakhurst. Reviewed Flight 24A trying to get, some azimuths .from Oakhurst but
records very poor. Reviewed records of ·Jan 2Jrd and started on stratosphere calculations.
Eileen working on corrections Jan 20 V2 rocket from meteorological data. Baten? in from
Florida Field Station, ready to go to Alamogordo next Tuesday.
March20 Thursday, Oakhurst. Went over final calculations for stratosphere data using
seiSJiic methods, of Jan 23 data with Vivian. Got V=J25 at 3 kms. Studied azimuths on that
data and got w = 10 m/sec coming from south on June 2Jrd. Worked with Eileen on rocket
Jan 20thcorrecting for met data and plotting final H against X in kms from surface for
up data.
March 21 Friday Oakhurst. Worked on Alamogordo plans - Lewis & Clowry over this pm and we
went over all future plans including bombing for Alamogordo. Worked on rocket data with
Eileen and on flight data with Y, S,1-4tpanoff on ray paths of Dec 13
March 22 Saturday Oakhurst. Went over all V2 rocket data. Studied azimuth - elevation
graphs & studied WAC Corporal of 3 March. Caught 534 train from Asbury Park - 1045
sleeper out of NYC
Marcb 21 Sunday. At boae. Arrived Cant.on abo~'!ow9. lo@;t'~1 .qn sleep~::r, tonight &bpltt 8 pm
March 24 Monday. Arrived NYC about 7. At 0930 went up J.o Math DQ&rtment at NYU - Washington
Square. Met Mr Bennett of WL. Found that Dr. Courant would not be in until late and decided
not to wait but caught 104o train to Asbury Park. Went over shipment ready for Alamogordo
and over work for Vivian and Eileen. Packing tonight.
March 25 Tuesday Truck at Oakhurst at 9 with scales - all equipment weighed - about 3500#
total including TORRID. Edmonton, Reynolds, Thompson, Porter, Godbie? and I left about 10
and went through to Mitchell Field in staff car. B-17, Carroll, pilot -- co-pilot. Left
Mitchel Field about 3 pm. High level winds - went southern route - stayed at Maxwell Field
Alabama tonight. Thompson stayed behind waiting for B-45
March 26 Wednesday, Left Maxwell Field, AlL.labout 9 and landed in Alamorgoro J pm
March 27 Thursday Alamogordo. Phil, Beynilds and I went out to Tower site, took in all wires,
Pulled down tent and Rubicon equipment and took it over to new site west of Lake Lucero.
Strung out wire, surveyed in site & set up Rubicon tent. Sal, Edmonson, Godbie?, Porter
weighing in equipment in Alamogordo air base.
March 28 Friday. Alamogordo. Went out with Godlers, Porter to White Sands west of air base.
Located site and surveyed it, put up shelter and set up GR). Phil and Reynolds went up tp
Tularosa site, Sal and Edmondson worked on GR8 and low frequency equipment, Thompson in
with B-45 from Newark.
March 29 Sat Alamogordo
March 10 Sun Alamogordo. Phil and I went out to Dona site and picked up some equipment and
then out to Lucero site. Set up Rubicon and took a record. Tried to get through to Tularosa
site west of White Sands but couldnt find road.

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.