The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 3 …The importance of attachment 32, Lieutenant McAndrew's synopsis, derives from his description of Project MOGUL…
  • p. 13 …Photographs, Project MOGUL Balloon Trains 27. Table No.7, Summary of NYU Constant-Level Balloon Flights…
  • p. 14 …Crane as Project Officer for MOGUL and TORRID, June 18, 1946 9. Memo, Maj Gen Curtis…
  • p. 25 …Records were located and thoroughly explored concerning a then-Top Secret balloon project, designed to attempt…
  • p. 27 USAF in September, 1947, the USAF inherited equipment, personnel, records, policies, and procedures from the AAF…
  • p. 29 …EVOLUTION OF THE EVENT FROM 1947 TO THE PRESENT General Ramey's press conference and rancher…
  • p. 31 …This included directing searches at current offices where special or unusual projects might be carried out…
  • p. 35 …USAF records showed that between June 24, 1947, and July 28, 1947, there were five crashes…
  • p. 41 …Its name was Project MOGUL (Atch 19). Project MOGUL was a then-sensitive, classified project, whose…
  • p. 42 …These interviews confirmed that Project MOGUL was a compartmented, sensitive effort. The NYU group was responsible…
  • p. 43 …It is very probable that this Top Secret project balloon train (Flight 4), made up of…
  • p. 44 …Trakowski provided specific details on Project MOGUL and described how the security for the program was…
  • p. 45 In order to provide a more detailed discussion of the specifics of Project MOGUL and how…
  • p. 48 …Copy of Vandenberg's Appointment Book and Diary, July 7-9, 1947 16. July 9, 1947…
  • p. 51 …Schiff complaiiled then that the Defense Department had been "unresponsive" to his inquiries about the 1947…
  • p. 73 …of the physicians who participated in this project. I must respect his confidentially and anonymity. He…
  • p. 74 •Freedom of Information Act Request February 5, 1993 Paqe 3 of 3 PROJECT SIGMA The project…
  • p. 76 SUMMARY OF HQ NAIC RESEARCH INTO THE ROSWELL INCIDENT, UNIDENTIFIED FLYING SAUCERS, AND PROJECT BLUE BOOK…
  • p. 78 …study project officer from 1951-1953 and he investigated a series of reports from 1947. He…
  • p. 104 …assWted command of Ro..;\vell .~rmy Air Field on e July 1947. Colo·nel i1. H…
  • p. 106 …Headqt~':'.!"ters, this station, datod 18 July 1947. 1st Lt. Lewis c. Bohanan. former commanding o…
  • p. 108 …Officer and AACS, regarding Headquarters AMC projects. 22 July- 1947 - Dr. E. M. Townsexrl, PBS, Ft…
  • p. 183 …There was a project run by New York University, out ofHoDoman at that time. It was…
  • p. 196 …Plans .for rasearoh on Project "t.t>cuJ. 1 " z. c. lS:~.-ll, priority lA, include…
  • p. 201 …On the December 1947 baUoon project reports the "service flights" probably refer to the then Top…
  • p. 205 …GeNII was the Project Engineer for the NYU balloon project during the 1947 time frame. I…
  • p. 206 …Dr Crazy and Dr Peoples were the advance people and scientific monitors for our project Dr…
  • p. 213 …I have also been contacted by several researchers and writers and discussed project Mogul and provided…
  • p. 217 Transcript from 8 June 94, Interview with Professor Charles Moore (A) Professor Charles Moore Project Engineer…
  • p. 218 …Is there any type of material from that project that you can think of that would…
  • p. 226 …so essentially you'd say there were no radar reflectors in New Mexico until 1947 until…
  • p. 246 …We got into an operation at Alamagordo in early June of 1947, in which we were…
  • p. 261 …It turns out that during this time frame, 1947, 1948, 1949, there were numerous aircraft accidents…
  • p. 275 …I remained project officer of Project MOGUL through our move of the laboratory from Watson Laboratories…
  • p. 281 …At some point in Project MOGUL did you utilize equipment based at Roswell Army Air Field…
  • p. 299 …B-29 crashed on T/0 from Albuquerque in Jan 1947 and a B-29 crashed…
  • p. 300 …Archivist (202) 504-5416 "no records of Project Mogul; recommend checking with DOE historian or the…
  • p. 309 …However, I was familiar with them because we used them and their products on various projects…
  • p. 318 …1947.4 An examination of unclassified technical and progress reports prepared by the balloon project revealed…
  • p. 320 …in January 1947, is shown in Attachment 2. Over the course of the project, MOGUL had…
  • p. 321 Air Forces, in conjunction with Project MOGUL. 10 The NYU "balloon group" was to develop and…
  • p. 322 …June 1, 1947.19 Present Olll this flight was C.B. Moore, NYU Project Engineer, Charles…
  • p. 323 …Dr Peoples, Project Scientist, decided not to bring the radiosonde recorder (an AN IFMQ1 weighing approximately…
  • p. 326 …Over the course of Project MoGUL, several balloons had landed and been recovered from that area…
  • p. 328 …Additionally, in 1949, General Yates received a full briefing bf the projects, including constant-level balloons…
  • p. 329 …Pritchard, a Watson Laboratory Project Officer (not assigned to MOGUL) stationed at Alamogordo AAF. This article…
  • p. 330 …One instance, on April 7, 1947, Crary gave Pritchard a "progress report for MOGUL project to…
  • p. 418 …From September 1946 to Januar,r 1947, Colonel Dut!7 WRI in charge of apnlled nropagation…
  • p. 444 …was decided, during the autumn of 1947 to present the meteorological diagnoses in a different form…
  • p. 708 …20 March 1947 N. Y. Meeting No. 12 PROBLEM: 1. The Secretary of the Subcommittee presented…
  • p. 747 …1, 1947 to Ma7 31, 1947 §tqttoa II tt.aearch D1'fie ion, ProJect 1fo. 93…
  • p. 758 …January 1, 1947 to April 30, 1947 CONSTANT LEVEL BALLOON Research Division, Project No. 93 Preoared…
  • p. 776 …The project ~rsomlel !las been usiiU:; work bencl:.ea occ;.i.9ied by other projc:cts…
  • p. 790 …12. :20 l11arch 1947 PROBLEM: 1. The Secretary of t~e Subcommittee presented a request from…
  • p. 819 …June 1, 1947 to June 31, 19"7 Section II Research Division, ProJect No. 9S Prepared…
  • p. 975 …Army Air Forces, in 1947, and later Chief of Staff, United States Air Force, 1961-1965…
  • p. 979 …break during Project MOGUL operations at White Sands Proving Ground, NM, July 1947. Project MOGUL Field…
  • p. 982 …the NYU field trip in June 1947 prompted Project Engineer C.B. Moore to attach additional…
  • p. 983 …Moore, NYU Constant-Level Balloon Project Engineer. Moore pio- neered the use of polyethylene balloons for…
  • p. 984 …Sands Proving Ground, NM, in July 1947, by Project MOGUL balloon and ground-based sensors. Photo…
1947 5
not come so got rideinto Army base. Phil in later. ' 7ery windy for recording.
Feb 19 '·Ted, Alamorgordo. Got radios from 'iatrus of Signal ~orps and got trip tickets for
tomorrow, Ra~ test rP.cords on ~ubi con at both sites and checked e·rerythir.g ready for
tomorrow.
?eb 20 Thurs. Alamogordo. Cut early to station at Tower. Left Phil off there and went over
to Dona Site. Rocket delayed from 10 to 1119. Both stations got good recordings except
1 9T-NS on both \-lG. :·!orked on GR8 records tonight.
:Ce b 21 Fri. Alamogordo. :lent to l,Jhite Sands Proving Grounds with Fri tchard I ragnir? I Sol
& Phil this morning for 'T-2 critiques, 0930 to 1100. Canister from rocket unpacked? about
40 miles up and finally found this pm between El Paso and Alamogordo. :lo transportation
back to NJ yP-t. 'llorked on GR- J records today
Feb 22 SatL Alamogordo. 'iorked on data all day today. Correlated between the ~ower and Dona
sites for se·reral sources. 'o!orked total travel times for asce~ts both ;)or.a and ?ower and
got average velocities up to about 65 kms, 'relocity increases from about 40 kms up to
60. Average velocity at 65 kms is about J20 meters per sec.
Feb 23 Sun. Worked on detailing record from GRJ, .Added more and made 'I'-D move up to .
75 kms~ giving velocity of about 420 m/sec at top.Phil and Sal went out and picked up equip-
ment - T-791s and GR8 and checked all pickups.
Feb 24 Mon. Alamogordo. '.faited for air transportation today but none available and may not
be any until Thurs at latest, Worked on V-2 recordings, frequency and characteristic anal-
ysis - T-J. Sal and Phil out to Site at Dona and recorded WAC Corporal at 1400. Got some
waves,J,pJ about 7 .minutes after it had letio. grou,nd •.., , •.,. .: ., , . , ;J.- ·~ .• •
Feb 25 Tues. Alamogordo. )~ent out to Tower Site, surveyed in #6, took down shelter. To Dona
Site, set up GRJ in shelter, surveyed in #6, went to launching site, about 2 -3 miles NW
launching area. Phil went in to '·TSPR and got permission, Sal and I surveyed 1 site for use
with WAC Corporal.
Feb 26 ~led. Alamogordo. \forked on GR8 records of 20 Feb V-2 rocket. This am Phil and Sal set
up Sounding? site for tomorrow's W.A.C •. ! left 7 p~ - .C-47 Hoffman,,Missinger: Pilot, co-
pilot, .arrived in Newark 9am.
Feb 27 Thurs. Arrived)Newark 9 am. Lewis, Duff,Mosher a request? in from Y.iddletown - on
way to WL to conference and I rode in with them. Conference re future missions. Conference
PM Trakowski 1 Peoples, Rying & mysel;f regarding future operations
Feb 28 Fri. Oakhurst. Ewing in from NYC. Nent over Alamogordo results with Ewing, Peoples
and Trakowski. Out to Peoples to~ight
fo!arch 1 Saturday. Asbury Park
March 2 Sunday Oakhurst. worked on calculations for wind translations.
March 3 Monday.Oakhurst. Postponed Alamos.~:rd.qdt:r~P.i ut\1-.11~ tomor.rcn~ •• g\':t.hlpg,,~pg~er equip-
ment for Alamogordo. Thompson going also to get information on bombing runs? there, Worked
on calcqlation_!S 'from Y-.2 .. ~' . , . · , ; · . . . , • ' ;.; ·" .• ~ . ·• ·t \
March 4 Tuesday, Thompson and I left staff car about 930, arrived at Newark 104o. Loaded up
B-25 wittt .equiPIJ!ent and left ,about 1230. :~;topped at Middletown and ,picked· up ·r84\io. Stopped
at Scott Field & Tinker Field for gas. Arrived at Alamogordo 2 am. Crew B-25:Hoffman,
DeTurk, Hancock
(~arch 6 .Thursday. Alamogordo. Snowing - rocket flight called off until tomorrow. Chantz
out to Tower Site and brought in batteries. Sal and I checked low frequency equipment and
went out to Tularosa site with it this pm. Ready to use on 1 sec galv on Rubicon drum
1 I'arch 5 Wecinesday. Alamogordo. Ghantz, 'I'hompson ar.d myself out to Tulerosa si.te and surv-
~ eyed out X setup and ran out wires. Back about 2. Oliva working on check of T21s. Worked
on radio and T21s until tonight
Karch 7 Friday. Alamogordo. At 8 am Pritchard got word rocket would go off between 10)4
and 1200. Phil and Sal went out to Dona and Launching Sites with weapon carrier. Hoffman,
DeTurk and Thompson out with them in staff car. I took Jeep and went out to Tularosa site.
Rocket off at.112J. Got recording on GR8 but not time for Rubicon record. Phil and Sal got
OK eecords from their sites. Thompson reported on bombing sites for runs and met and talked
with Ordnance Officer. Left Alamogordo 845 pm , B-25 with Hoffman, DeTurck. Motor trouble
on way and reached? Tinker Field 1200 with cylinder broken.
March 8 Sat. Hoffman wired Alamogordo and caught Nanjak & Schneider (P4)? before leaving
for Florida. They changed their route and landed at Tinker Field, O.C. 535. Trouble with
their oil gauge and the trouble not repaired until 10 am. left Tinker ~ield 10 and landed
at Patterson. Off from patterson to Olmsted, Olmsted at 9pm. I stayed there overnight.

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.