Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 3 …The importance of attachment 32, Lieutenant McAndrew's synopsis, derives from his description of Project MOGUL…
  • p. 13 …Photographs, Project MOGUL Balloon Trains 27. Table No.7, Summary of NYU Constant-Level Balloon Flights…
  • p. 14 …Crane as Project Officer for MOGUL and TORRID, June 18, 1946 9. Memo, Maj Gen Curtis…
  • p. 25 …Records were located and thoroughly explored concerning a then-Top Secret balloon project, designed to attempt…
  • p. 27 USAF in September, 1947, the USAF inherited equipment, personnel, records, policies, and procedures from the AAF…
  • p. 29 …EVOLUTION OF THE EVENT FROM 1947 TO THE PRESENT General Ramey's press conference and rancher…
  • p. 31 …This included directing searches at current offices where special or unusual projects might be carried out…
  • p. 35 …USAF records showed that between June 24, 1947, and July 28, 1947, there were five crashes…
  • p. 41 …Its name was Project MOGUL (Atch 19). Project MOGUL was a then-sensitive, classified project, whose…
  • p. 42 …These interviews confirmed that Project MOGUL was a compartmented, sensitive effort. The NYU group was responsible…
  • p. 43 …It is very probable that this Top Secret project balloon train (Flight 4), made up of…
  • p. 44 …Trakowski provided specific details on Project MOGUL and described how the security for the program was…
  • p. 45 In order to provide a more detailed discussion of the specifics of Project MOGUL and how…
  • p. 48 …Copy of Vandenberg's Appointment Book and Diary, July 7-9, 1947 16. July 9, 1947…
  • p. 51 …Schiff complaiiled then that the Defense Department had been "unresponsive" to his inquiries about the 1947…
  • p. 73 …of the physicians who participated in this project. I must respect his confidentially and anonymity. He…
  • p. 74 •Freedom of Information Act Request February 5, 1993 Paqe 3 of 3 PROJECT SIGMA The project…
  • p. 76 SUMMARY OF HQ NAIC RESEARCH INTO THE ROSWELL INCIDENT, UNIDENTIFIED FLYING SAUCERS, AND PROJECT BLUE BOOK…
  • p. 78 …study project officer from 1951-1953 and he investigated a series of reports from 1947. He…
  • p. 104 …assWted command of Ro..;\vell .~rmy Air Field on e July 1947. Colo·nel i1. H…
  • p. 106 …Headqt~':'.!"ters, this station, datod 18 July 1947. 1st Lt. Lewis c. Bohanan. former commanding o…
  • p. 108 …Officer and AACS, regarding Headquarters AMC projects. 22 July- 1947 - Dr. E. M. Townsexrl, PBS, Ft…
  • p. 183 …There was a project run by New York University, out ofHoDoman at that time. It was…
  • p. 196 …Plans .for rasearoh on Project "t.t>cuJ. 1 " z. c. lS:~.-ll, priority lA, include…
  • p. 201 …On the December 1947 baUoon project reports the "service flights" probably refer to the then Top…
  • p. 205 …GeNII was the Project Engineer for the NYU balloon project during the 1947 time frame. I…
  • p. 206 …Dr Crazy and Dr Peoples were the advance people and scientific monitors for our project Dr…
  • p. 213 …I have also been contacted by several researchers and writers and discussed project Mogul and provided…
  • p. 217 Transcript from 8 June 94, Interview with Professor Charles Moore (A) Professor Charles Moore Project Engineer…
  • p. 218 …Is there any type of material from that project that you can think of that would…
  • p. 226 …so essentially you'd say there were no radar reflectors in New Mexico until 1947 until…
  • p. 246 …We got into an operation at Alamagordo in early June of 1947, in which we were…
  • p. 261 …It turns out that during this time frame, 1947, 1948, 1949, there were numerous aircraft accidents…
  • p. 275 …I remained project officer of Project MOGUL through our move of the laboratory from Watson Laboratories…
  • p. 281 …At some point in Project MOGUL did you utilize equipment based at Roswell Army Air Field…
  • p. 299 …B-29 crashed on T/0 from Albuquerque in Jan 1947 and a B-29 crashed…
  • p. 300 …Archivist (202) 504-5416 "no records of Project Mogul; recommend checking with DOE historian or the…
  • p. 309 …However, I was familiar with them because we used them and their products on various projects…
  • p. 318 …1947.4 An examination of unclassified technical and progress reports prepared by the balloon project revealed…
  • p. 320 …in January 1947, is shown in Attachment 2. Over the course of the project, MOGUL had…
  • p. 321 Air Forces, in conjunction with Project MOGUL. 10 The NYU "balloon group" was to develop and…
  • p. 322 …June 1, 1947.19 Present Olll this flight was C.B. Moore, NYU Project Engineer, Charles…
  • p. 323 …Dr Peoples, Project Scientist, decided not to bring the radiosonde recorder (an AN IFMQ1 weighing approximately…
  • p. 326 …Over the course of Project MoGUL, several balloons had landed and been recovered from that area…
  • p. 328 …Additionally, in 1949, General Yates received a full briefing bf the projects, including constant-level balloons…
  • p. 329 …Pritchard, a Watson Laboratory Project Officer (not assigned to MOGUL) stationed at Alamogordo AAF. This article…
  • p. 330 …One instance, on April 7, 1947, Crary gave Pritchard a "progress report for MOGUL project to…
  • p. 418 …From September 1946 to Januar,r 1947, Colonel Dut!7 WRI in charge of apnlled nropagation…
  • p. 444 …was decided, during the autumn of 1947 to present the meteorological diagnoses in a different form…
  • p. 708 …20 March 1947 N. Y. Meeting No. 12 PROBLEM: 1. The Secretary of the Subcommittee presented…
  • p. 747 …1, 1947 to Ma7 31, 1947 §tqttoa II tt.aearch D1'fie ion, ProJect 1fo. 93…
  • p. 758 …January 1, 1947 to April 30, 1947 CONSTANT LEVEL BALLOON Research Division, Project No. 93 Preoared…
  • p. 776 …The project ~rsomlel !las been usiiU:; work bencl:.ea occ;.i.9ied by other projc:cts…
  • p. 790 …12. :20 l11arch 1947 PROBLEM: 1. The Secretary of t~e Subcommittee presented a request from…
  • p. 819 …June 1, 1947 to June 31, 19"7 Section II Research Division, ProJect No. 9S Prepared…
  • p. 975 …Army Air Forces, in 1947, and later Chief of Staff, United States Air Force, 1961-1965…
  • p. 979 …break during Project MOGUL operations at White Sands Proving Ground, NM, July 1947. Project MOGUL Field…
  • p. 982 …the NYU field trip in June 1947 prompted Project Engineer C.B. Moore to attach additional…
  • p. 983 …Moore, NYU Constant-Level Balloon Project Engineer. Moore pio- neered the use of polyethylene balloons for…
  • p. 984 …Sands Proving Ground, NM, in July 1947, by Project MOGUL balloon and ground-based sensors. Photo…
1~ 4
Jan 30 Thurs, Plotted up angle of azimuth against angle of descent for ··-2 recordings.
Set aside this work for bombing rlins, ',.J'orked on Flight 18 with '.7i vi an. Started Eileen
on calculations uith Aug 8 and 9 data, reworking calculations doe before. C:hecked picks
on Flight 18 - they appear to be sky waves though angle of descent is not regular.
Jan 31 Fri Oakhurst. ~orked with Eileen on Aug 8 calculations. Finished up for both direct
and reflected possibilities. :vent over Flight 19 records. ?ound that all of these are sky
Ha•:es.
feb 1 Sat. Left A.P. for Philly on 940 bus, arrived at ~1arions apt about 1. :\ayne back from
Hork about 5. After dinner we 'Went out to Newtown and stayed overnight.
Feb 2 Sun. Drove up to Sparta NJ with !~arion and Wayne. Saw Dorothy, Joe and family. Nelson
Steenland & family living there with them. Saw >Iorzels pm. Ed Douglas in tonight for few
n:inutes. Joe took me over to Dover & caught 9.58 train, then 1120 out of Penn Station,
~7ewark. Arrived AP about 1230
Feb 3 Mon Oakhurst. Peoples in Washington regarding balloon ascention in June, Made plans
for flight 20 which was made this pm 1)00 to 1320 in conjunction with instruments in blimp.
Route just south of east, no results. ~orked on sky waves from Flights 18-19.
Feb 4-5-6, Tues, Wed, Thurs. Oakhurst. Checked over all sky wave picks on Flights 19 - 19.
Went over Loran data and plotted up to get accurate plane speed, Plotted T - X curve using
these figures. Worked up Oakhurst corrcetions for elevations and replotted all values for
velocity - Flights 18 - 19. Received Gutenberg letter in which he had worked out Aug 8,9
data. Went over this method and worked over thae data again. Unique solution not obtainable.
Went over possible experiments in 'Hellos' balloon ~une with Peoples.
Feb 7 Fri Oakhurst • .-Worked on 23, 24 Jan T-X curves. V files 2),24 Jan forms, started on
NYU data. Eileen worked on least squares-Va , then on Gutenberg's method applied to Aug 9
data.
Feb 8 Sat Oakhurst. Worked on V-2 rocket information 23 Jan. Used meteorological informatior
for 2 explosions. Tried to get V at height of eiplosions but seems too low.
Feb 9 Sun Asbury Park - worked on calculations of flights, setup? and calculations for
rockets.
Feb 10 Y.on Oakhurst. Worked over Alamogordo Radar Hueco stations for 23 Jan 1947 records
and made plot of V-2 rocket D - H using all radar data. 1'1'ent over all equipment to go to
Alamogordo. Made plans for departure Thurs. Set up 8 sec galv in T-9. Vivian checked
velocity from caps with temperatures and continued on Oct 22-23, Flights 12-lJ, Cruises,
NYU data. Eileen in pm - worked on formulas ofc.seismib refraction using straight line for
line - Aug 8 - 9. Finished this and went back to least square solutions of Jan 23 -24 data.
Feb 11 Tues Cakhurst. Flight 21 scheduled for 8 tonight postponed until tomorrow. Worked on
Oct 22 data with sky waves to Highland Lights. Went over all records. Have 2? consecutive
shots to H. L. Oliva left by train tonight for Alamogordo. ~" · · 1 ' t ·.
Feb 12 Wed Oakhurst. Vivian & Eileen worked on temperatures and winds Oct 22 & 23 and worked
up ray paths f9r sky waves to Highland Lights. All equipment for Alamogordo asseabled and
loaded on trucks for Watson Labs this pm. Flight 21 at midnight tonight. McCurdy, Chantz,
Woodruff, Ball, Hom?, Rigny present. Dropped 20 bombs 1200 to 1237. No signals received,
either sky or direct waves.
Feb 13 Thurs. Got special instruments for 1 cycle from McCurdy this ~. Drove up to Newark
in staff car- Chantz & myself. Loaded B-25 this pm but could not get all equiprrent on.-left
5 reels and box of equipment ? • Left Newark about JJO, stopped in r-:iddletown, Pa -
Olmsted Field for 1 1/2 hrs to eat and gas plane, then left and landed at Godman Field out- ,,
side Fort Knox, Louisville, Ky. Stayed at Officers Club tonight.
~eb 14 ~ri Left Louisvilleabout 930 am. Stopped at Tinker Field, Ok City for eats and refuel
then to Alamogordo, Arrived Alamogordo 4)0 pm - contacted Watson Lab and got truck. Unloaded
all equipment from B-25 & took part of it to North hanger. 3-25 cre•r:lt Yosher, Lt Alberts,
Sgt ? Oliva arrived Alamo. by train this ~
Feb 15 Sat. Moved eqpt from north hanger across runway to stowage building. Checked T-21s on
GR ~. Checked galvanometers, etc
?eb 16 Sun Alamogordo.Out to Tower and Dona sites & surveyed in instrument locations - 5 to
be station(ed) in shape. Ran out field wire at Dona station.
Feb 17 Mon Alamogordo. Went out to Tower site and set up Springnether and GRJ equipment.
Rubicon 500 ft from GR3. Took trial recordings on both equipments
Feb 18 Tues Alamogordo. Went out to Dona Site this morning. Set up GR8 then Phil took truck
and went over to GR1 Tower tsite. WACtcornoral shot offtabou~ 215 but with little slipstream.
Recorded at vona out Ph1~ a Tower si e naver saw rocKe • Walted at Dona until 6 pm. Phil hae

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.