The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 3 …The importance of attachment 32, Lieutenant McAndrew's synopsis, derives from his description of Project MOGUL…
  • p. 13 …Photographs, Project MOGUL Balloon Trains 27. Table No.7, Summary of NYU Constant-Level Balloon Flights…
  • p. 14 …Crane as Project Officer for MOGUL and TORRID, June 18, 1946 9. Memo, Maj Gen Curtis…
  • p. 15 …Army GR-3 Sound Ranging Set, TNT Detonation, and Project MOGUL PT Boat Project MOGUL Neoprene…
  • p. 18 …Project MOGUL resulted from two important post-World War II priorities set by the Commanding General…
  • p. 19 …However, too much activity was going on for the project to remain completely hidden. A MOGUL…
  • p. 25 …balloon project, designed to attempt to monitor Soviet nuclear tests, known as Project MOGUL. Additionally, several…
  • p. 41 …Its name was Project MOGUL (Atch 19). Project MOGUL was a then-sensitive, classified project, whose…
  • p. 42 …These interviews confirmed that Project MOGUL was a compartmented, sensitive effort. The NYU group was responsible…
  • p. 43 …so because he was either aware of Project MOGUL and was trying to deflect interest from…
  • p. 44 …Trakowski provided specific details on Project MOGUL and described how the security for the program was…
  • p. 45 In order to provide a more detailed discussion of the specifics of Project MOGUL and how…
  • p. 46 …First, the recovered wreckage was from a Project MOGUL balloon. There were no "alien" passengers therein…
  • p. 48 …Illustration of Project MOGUL "Balloon Trains" 26. Two Photos of Project MOGUL "Balloon Trains" 27. Log…
  • p. 183 …It was called Project Mogul. SC: Never heard of it. RW: Mogul was designed to run…
  • p. 195 …Equipments used in project "Mogul" are common to other systems or sets that are now class…
  • p. 201 …secrecy agreements for various projects, and I understand that this activity (Mogul, etc. is now declassified…
  • p. 205 …I was not aware that the project had the name MOGUL until1992 when I was contacted…
  • p. 206 …The Watson Lab gear was the microphone equipment specifically for MOGUL. The idea was proposed in…
  • p. 213 …I have also been contacted by several researchers and writers and discussed project Mogul and provided…
  • p. 217 …We have gone through many of the various technical documents related to Project Mogul and some…
  • p. 218 …Project Mogul was probably involved in this incident. The materials that were being used in Mogul…
  • p. 220 …it was offered and was the project officer on Mogul. I have some paperwork here from…
  • p. 226 …proving ground across the Tulerosa Valley; and Project Mogul. I joined the NYU group in January…
  • p. 237 …So you were the project engineer? A: I was the project engineer, and Schneider was the…
  • p. 241 …I interpreted that as saying someone was covering up on Mogul. That was my interpretation when…
  • p. 242 …so you went, moving into Mogul, you did go on the June and July field trips…
  • p. 244 …The balloons that you did launch for Project Mogul and some of the other test balloons…
  • p. 246 …Mogul was classified, and he said it had the same classification as the Manhattan Project had…
  • p. 255 …But the aircraft operation here was entirely to support Project Mogul. We didn't consider ourselves…
  • p. 273 …The balloon was not a weather balloon, but was then a classified project, Project MOGUL, which…
  • p. 274 …I came into being as the project officer on Project MOGUL about November of 1946. I…
  • p. 275 …I remained project officer of Project MOGUL through our move of the laboratory from Watson Laboratories…
  • p. 278 …But we were aware of the sensitivity and of the weakness of security in Project MOGUL…
  • p. 281 …At some point in Project MOGUL did you utilize equipment based at Roswell Army Air Field…
  • p. 289 26 Photographs Project MOGUL Balloon Trains
  • p. 299 …60's; we have no reference to Project MOGUL" Ms Betsy xxxxxxxxxx d) Sperry Hagley Museum…
  • p. 300 …Archivist (202) 504-5416 "no records of Project Mogul; recommend checking with DOE historian or the…
  • p. 318 …The project's classified code name was MOGUL. The current investigation discovered that an experimental ba1loon…
  • p. 319 PROJECT MOGUL Project MOGUL was first conceived by Dr. Maurice Ewing of Columbia University, NY, and…
  • p. 320 …Over the course of the project, MOGUL had three military project officers, or "chiefs": Maj Robert…
  • p. 321 Air Forces, in conjunction with Project MOGUL. 10 The NYU "balloon group" was to develop and…
  • p. 322 …advance team made the first launch for Project MOGUL from Alamogordo (NYU flight no. 3). The…
  • p. 323 …Radiosondes, along with aircraft, were to be the primary method to track the Project MOGUL balloons…
  • p. 326 …Over the course of Project MoGUL, several balloons had landed and been recovered from that area…
  • p. 327 …There, it was identified by Colonel Duffy, under whose purview Project MOGUL operated. Colonel Duffy, a…
  • p. 328 …briefing bf the projects, including constant-level balloons, that made up Project MOGUL.40 While crashed…
  • p. 329 …Pritchard, a Watson Laboratory Project Officer (not assigned to MOGUL) stationed at Alamogordo AAF. This article…
  • p. 330 …One instance, on April 7, 1947, Crary gave Pritchard a "progress report for MOGUL project to…
  • p. 331 …Project MoGUL Classification Letter 10. Drawing of "Hieroglyphics" by Prof. C.B. Moore 11. Alamogordo Daily…
  • p. 411 …Crane as Project Officer for MOGUL and TORRID June 18, 1946
  • p. 810 …Gave him memo of progress report for MOGUL project to date, talked to Lt Dyer of…
  • p. 975 …a strong influence on the high- priority Project MoGUL (see Apps 8 and 9 ). He also…
  • p. 979 …Crary (left) and technician Phil Chantz taking a break during Project MOGUL operations at White Sands…
  • p. 980 …received and resulted in the initiation of Project MOGUL (see App 6 ). Photo Courtesy of Woods…
  • p. 981 …Marcellus Duffy, a highly capable scientific research officer, was a MOGUL project officer. Maj. Gen. Curtis…
  • p. 982 MOGUL Project Scientist Dr. James Peoples. Peoples's deci- sion not to bring the radiosonde tracking…
  • p. 984 …This modified PT boat that was assigned to Project MOGUL is shown here off Block Island…
  • p. 985 Launch of Project MOGUL neoprene balloons, Alamogordo AAF, NM, June 1947. While awaiting the experimental polyethylene…
  • p. 986 …Moore (right and reaching down) prepares experimental Project MOGUL microphones for launch (Holloman AFB, Alamogor- do…
1947 3
.Jar 11 2at. Oakhurst. '.forked on sky wa•1e data of Aug R. Drew up curves for lower and upper
~tratosphere. Regung? brought in calculator from 'fright ?ield .
.;an 12 3m:. C'akliurst. ~-'orked on sky :raVF~s .\ug Ath and 9th. Got out letter to Gutenberg
pertaining to those two days .
.Jan 13 Eon, Oakhurst. Workililg on sky wave curves. Made plans for Alamogordo this Thursday
!an 14 ~ues. Cakhurst. Calibrated instruments A-21 to take to Alamogorso. Raining
,:ar 1S :·led. Oakhurst. Started writep of '.'-2 rocket 'rork. Jr O'Day in fron 'tlatson and He
i-iert o·;er '-2 rocket pro£ram with him. "'inished calibration of ':'-21s on GR P, ''ivian fin-
ished sky wave curves. :<forked on Dec 31 ~·:oods Hole recordings .
.·an 16 '::'hurs. Oakhurst. All equipment for Alamogordo packed and loaded on truck pm. ':iorked
·:ith 'i ·,rian on sky wa··1es of A~ 8th and 9th.
:'an 17 i"ri. Oakhurst. 'Jonference with '::apts Levris, ';lowry and Duff of Clmstead Field and
:ere:_ at 1230 regarding bombs, future flights, etc. ~:athematecian fror.! HeWr.lan's group
started work this noon - for two '/leeks. - working with '!i ·rian. :food ruff and Chantz went
up to Newark with equipment and loaded on P"-47. \vent up at 2 pm by staff car. P-47 left
:'ewark 133 pm, landed at Patterson for fuel, landed at Tinker Field, Okla City 120 am,
Stayed there overnight, Officers Manjak and Layden.
Jan 18 3at. Left Oklahoma City about noon and went as far as Amarillo. Stayed at Amarillo -
at Clinton Hotel
Jan 19 Sun Left Amarillo about 1130 CST
IC.ent off plane and put in north hanger.
galvanometers broken. Repairing tonight
arri"ed Alamogordo 1230 pm RMST. Unloaued equip-
Unpacked GR-8s, T-21 galvanometers. J T-21s and 2
Jan 20 :'on Alamogordo. Tested out T-21s at north hanger with GR-8s. Loaded up all equipment
for c::- 3 and Rubicon drum and went out to A1 tower. Set up house along roacf about 3/4 mi
southeast of the tower. Ran out 3 1000' lines for the at 120° radii. Set up dark room
tent and 2 galv l&N broken suspensions. Worked on timing circuits, T-21s and galv at
Alamogordo Air 'Base.
Jan 21 Tues Alamogordo. ~ried out more T-21s with GR-8. All OK but one. Set out Site 2 near
Hwy 70, C&GS marker 'Dona'. Laid out 1000'cables, set up Rubicon. Went out to end of Doppler
line to station G but could not find C&GS marker 'Town' . lfent back along line toward block-
house & set up site #1, cables and Rubicon drum at intersection of G line and 0 line.
Sites now set up 6, 13, 19 mi from blockhouse, all about 2 mi east of N line from boundary?
site
Jan 22 :{ed Alamogordo. Made rounds of all 3 sites. Set up l&N at Site #3, & surveyed to
tower. Took T-21s and GR-8s to Sites 1 and 2 and set them up ready to operate. Took
Rubicon recordings at Site 1 and 3 to check galvanometers.
Jan 23 Thurs. Alamogordo. Left air base about 900~ 1.~.,Bombing postponed from 11 am to J pm.
~·!ent out to Site 3, surveyed to tower. Got GR-3 recordings. Left Chantz at Site J and went
to Site 2. Woody left Site 2 and went to site 1. Bombing delayed by 15-JO minute intervals
from 3 pm to 519 pm. Got good recordings at Site 2 • Both other stations lost to triang-
ulation acc't radio communication though Woody had GR-8 operating but without directional
instrumnets.
Jan 24 Fri. Alamogordo. Checked with Major Pritchard at base. Left about 830 and picked up
all equipment fro~ J sites. Surveyed Site #2 and made rough survey of Site #1
Jan 25 Sat. Alamogordo, Sorted out all equipment at north hanger. Left GR3, Rubicons and
Sprengnethers. Packed up GR8's and other equip~ent and loaded in C-47. :arroll and Short
in G-47 from ifiddletown. ready to lea·:e tomorrow. Worked on Site 2 recordings pm. got
azimuths and angles of ascent for 2 main explosions. Have high angle o~ ascent.
Jan 2c Sun. Left Alamogordo about 830 an in C-47, Lt Sherry of Alamogordo pilot. Landed
at Scott Field, St Louis for gas & eats, and then to Fatterson Field, Dayton, Chic where
11e stayed o-,ernight acct bad weather east of Pittsburg.
Jan 27 Bon. Left Patterson Field about 930 am, arrived in Newark near noon. Chantz and
';loodruff left by train. I went to Oakhurst with truck and equipment.Arrived about 330 pm.
Peoples going to.... ~.fashington tomorrow to V-2 panel meeting with Trakowski.
Jan 28 Tues. Oakhurst. Worked up diagrams for azimuth and offset distances, also angle of
descent fron Site 2, Alamogordo. Went over recording, got about 20 recordings on first
part but only 2 on down part.
Jan 29 Wed. Oakhurst. Worked on latter part of V-2 recording of Alamogordo. Got 2 recordingf
tesides 2 large ones, but very poor. ~.Jerked up possible trajectory of 'l-2 rocket. ~forked
up fuiure program for Alamogordo - Chantz & Oliva leaving about 10 February for semi-
IIe,..ll!lanent work there. 1
.•ie are passing up Feb 6 rocket but starting on definite program
ro lowing that.

Cases discussed