Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 5 …at the National Air Intelligence Center, Wright Patterson AFB, OH. Mr. Ashcroft gave freely of his…
  • p. 7 …Walker, Historian, Air Force Materiel Command, Wright-Patterson AFB, OH; TSgt. Donald Valentine, Administrative Specialist, 89th…
  • p. 30 …to Wright Field, now known as Wright-Patterson AFB, Ohio. The latter location was the home…
  • p. 51 …and then to what is now Wright-Patterson Air Force Base in Ohio. In 1989, NBC…
  • p. 71 …We also attach a report from the National Air Intelligence Center (NAIC) at Wright-Patterson AFB…
  • p. 76 …the crash site and transported to Wright-Patterson AFB, Ohio. BACKGROUND. In 1993, Congressman Steven Schifffrom…
  • p. 77 …s) and/or alien(s) at Wright-Patterson. Because this conclusion is based on the absence…
  • p. 202 …therefore sent it to him at Wright Patterson- -not because it was extraterrestial) It is a…
  • p. 222 …The Kaysam company in Patterson made a cast neoprene emulsion into a mold~ and then they…
  • p. 309 …And that a flight had been set up to send it to Wright Patterson AFB OH…
  • p. 767 …Rigney 2/10/47 Contracting Officer Watson Laboratories Red Bank, New Jersey 2/11/47 Patterson…
  • p. 805 …S-_54 left El Paso 400 pm , landed in Patterson ~ield, Dayton, Ohio 110ar. Dec 20…
  • p. 806 …P-47 left :'ewark 133 pm, landed at Patterson for fuel, landed at Tinker Field, Okla…
  • p. 808 …left Tinker ~ield 10 and landed at Patterson. Off from patterson to Olmsted, Olmsted at 9pm…
1/28/47 Kollsman Instrument ·Co.
Elmhurst, L. I.
Att; ?a.ul Goudy
2/3/47 Contracting Officer
Watson Laboratories
Red Bank, New Jersey
2/7/47 ~atson Laboratories
Red Bank, New Jersey
Att: Mr. D. Rigney
2/10/47 Contracting Officer
Watson Laboratories
Red Bank, New Jersey
2/11/47 Patterson Bros.
New York City
Att: Mr. H. Carey
2/18/47 Contracting Officer
Watson Laboratories
Red Bank, N. J.
2/24/47 General :Hills
Minneapolis, Minn.
Mr. 0. c. ~inzen
Request for quotation Quotation supplied.
of 3 ea. of the follow-
ing altitude control
equipment:
1. Motor switched
modulators.
2. Elec. controlled
dribblers.
3. Mech. controlled
dribblers.
Forwarding quote from Not approved.
Unexcelled & requesting
approval.
Requesting permission Permission granted.
to build a 27 cubic foot
inflation shelter.
Forwarding quotation
received from Kollsman
Instrument Co. for the
necessary control de-
vices for the constant
level balloon.
Permission granted
to place subcontrac-
Advising that one Ungar Replacement made.
electric soldering pencil
is being returned under
separate cover as it vas
received in unusable con-
dition. Request for re-
placement made. Quotation
enclosed. ··
Requesting permission toPermission withheld.
place subcontract with
Unexcelled Chern. Corp.
for the fabrication of
be.lloons.
Request th.".t quotation Declining to quote
be supplied for the until after confer-
fabrication of 15-15 ft. ence with NYU
diameter balloons and representa~ives.
6-3 ft. diameter balloons
made of various thick-
nesses of polyethylene
and Saran.
- 9 -

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.