Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 51 …Kopelson said the office's investigation, first reported in the Albuquerque Journal yesterday, stemmed from a…
  • p. 82 …northwest ofHobbs NM 7 miles southeast of Albuquerque NM Carrizozo NM 15 miles southwest of Alamogordo…
  • p. 176 …of command that reported to Kirtland in Albuquerque rather than Fort Worth and although Blanchard outranked…
  • p. 225 …Tibbetts, who until recently lived in Albuquerque, he's now moved to Scottsdale, Arizona. Tibbetts says…
  • p. 273 …Another fellow recently came into view, a Carl Pflock from Albuquerque, New Mexico. He appeared to…
  • p. 299 …B-29 crashed on T/0 from Albuquerque in Jan 1947 and a B-29 crashed…
  • p. 379 …but h.e thought the constru~t.ion. ~;ent here from the Albuquerque wondered if what…
  • p. 543 …reports. Reports from .l!il Paso, Roswell. Albuquerque and White Sands were used for comparison with…
  • p. 637 …WNW-5 W-7 10,000 M Albuquerque 1944 SE-3 W-3 W-6 W…
  • p. 639 …3 wsw-2 WNW-5 'WNW-8 Albuquerque 1944 N-3 "WNW-4 WNW-6 W…
  • p. 723 …representative preaeurea and temperatures taken from Washington, Albuquerque, Pittsburgh and Lakehurst soundings. Individual variations from season…
  • p. 740 …was reported to have been seen over Albuquerque, New Mexico, and about 26 hours later a…
  • p. 742 …Over Albuquerque, which was considerably farther from the path of the balloon than the other two…
  • p. 788 …The .altitudes corresponding to various molar volumes for Lakehurst am Albuquerque in January and in August…
(Approximate)
where G • gross load
A chart, Figure 24, has beendrawn up, based on this equation, expressing free
lift as a percentage of gross load, allowing the rate of rise to be approximately
predetennined.
E. Ballast Requirements
The amount of ballast Which must be dropped through the manual
ballast valve to keep the balloon at its ceiling, can be approximately
determined by the following measurements: a balloon of similar size and
construction is inflated and its loss of lift with time is measured with
correction for variation of temperature. This inflation is not complete,
but is of the same magnitude as that of a balloon ready for release,
approximately 14%. of full inflation in the case of a General Mills balloon.
The loss of lift per hour, multiplied by a factor representing the increase
of the surface ~nich results from total inflation, is thus obtained. This
factor is the reciprocal of the fraction of inflation raised to the two-thirds
power for a spherical balloon, and is approximately the same for the tear-drop
shaped General Mills balloons.
Field experience has shown that ballast leak pre-set to slightly exceed
the computed loss of lift is insufficient. A bailast leak of double the
computed loss of lift has usually been adequate. It is believed that increased
liquid viscosity and valve closure caused by the ·colder temperatures of the
high atmosphere are responsible for the need for this higher ballast setting.
An investigation into temperature effects on the ballast release systems has
been started.
1he amount of ballast which must be released ~.t sunset to compensate
for the loss of superheat, may be computed as followu
- 19 -

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.