The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 539 …Too muoh weight was lost in this action, and the train rose until aome of the…
  • p. 540 …Train, Flight 10 The balloon rose to about 16,000 teet MSL and dropped back to…
  • p. 554 …It will be seen that the balloon rose~ a ' .. --------- r- ....., ..:. Pon"'m j"'.,.._" k '~I I…
  • p. 572 …obtained, but during this time the balloon rose with predicted speed (500 feet per minute) nearly…
  • p. 585 …On the other hand, the balloon rose extremely slowly and may have taken in air to…
  • p. 665 …In flight 7, however, the cluster rose till the lifters were cut off, descended until sufficient…
  • p. 739 …As a result, the cluster rose to ceiling and stayed at this altitude for a short…
  • p. 786 s4cond cluster flight, provision was also made to release balloons if the train rose above 40…
Fli!!'ht 82: Released from Alamogordo, New Mexico, 0515 MST, August 10, 1948
Recovered at Roswell, New iloiexico
This flight was made with a 20-foot, .001" polye~~ylene balloon carrying
a load to 54,000 feet and sustained by a t·ixed-leak orl'ice control, ex-
pending ballast at abcut 525 grams per hour. '\Vith 4500 grams of ballast aboard
the· balloon should have been increasingly buoyant t'or ~ hours after release.
From the barogram (Figure ~5) it may be seen that the "ceiling" did rise, at
T1me-MST
NYU BALLOON PROJECT FLIGHT 82
Barograph Record Of G.M. 20• Plast1c Balloon W1th
5 34 gm/hr F1xed Balldst Leak
RELEASED AT ALAMOGORDO, N.M.- 0511 MST, 10 AUG 1948
DESCENDED AT ROSWELL,N.M.- 1630 MST, 10 AUG 1948
DURATION- IIi hra
Figure 35
a rate of 700 feet per hour (525 gra.."lls of' ballast was lost each hour), i'or
about 7~ hours, and then generally accelerating descent was experienced.
On this flight, radio reception was maintained i'or the entire air-borne
period of 11 hours. Flight 82 is a good example of i'light using a single
fixed-leak orifice for altitude control by ballast dropping.
-43-

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.