“York”60+ pages
- p. 14 …New York University, Constant Level Balloons, Final Report, March 1,
1951
11. New York University, Constant…
- p. 18 …Developed partly under contract with leading
scientific institutions-such as New York University (NYU), Woods Hole…
- p. 19 …New York Times, "Balloon Staggers Down to Brooklyn Tavern, Hooks Itself to Roof and Upsets
Decorum…
- p. 41 …testing "constant level balloons" and
a New York University (NYU)/Watson Labs effort that used" ... meteorological…
- p. 72 …Foundation then
on 23rd Street in New York City. The pathological examination
disclosed a human with…
- p. 148 …i.L?...D"- Erun_2 o:f New York - Gm. ~ advised he would let hi!:: know…
- p. 183 …There was a project run by New York University, out ofHoDoman at that time. It
was…
- p. 206 …When we heard the news back in New York, w.e joked that they probably
found…
- p. 213 …early July 1947, to observe the New
York University balloon group. The "Roswell Incident" occurred after…
- p. 217 …he was Director of Research at New York
University at that time.
Q: We have gone…
- p. 220 …But anyway, Istvan initially went to New York hunting for a
source of supply and came…
- p. 222 …I've reviewed the New York
University documents and there's a very clear depiction in…
- p. 233 …you to join the
staff at New York University, or to continue your studies there?
A…
- p. 234 …So you went to New York University when?
A: Right after
had already started.
a copy…
- p. 237 …You went on board at New York University, and you
immediately set out, as documented in…
- p. 240 …So at this time in New York University you were cleared
but you had no need…
- p. 243 …In the New York University report it says that you were
provided two Japanese balloons.
A…
- p. 244 …they have reward tags, "Return to New York
University," or "Return to Roswell Army Air Field…
- p. 247 …so you made your plan in New York to fly •.• Your
primary research was the acoustical…
- p. 261 …The New York University reports are very voluminous.
There are three big bound volumes. I have…
- p. 275 …Charlie Moore and his crew from New York University.
Q: You said you went in July…
- p. 319 …W28-099-ac-82) for the acoustical
equipment, and to New York University (NYU) for the…
- p. 320 …NEW YORK UNIVERSITY "BALLOON GROUP"
From September 30, 1946, until December 31, 1950, the Research Division…
- p. 322 New York University, in accordance with contractual requirements, produced
monthly progress reports, technical reports, and final…
- p. 326 …worlk and
preparing to return to New York City, a train of events began to unfold…
- p. 327 …Kevin Randall and Donald Schmitt, UFO Crash at Roswell (New York, 1991), p. 103.
39. Intvw…
- p. 331 …Drawing-New York University Flight No. 2
4. 2 Depictions of AN I CRT-1 Sonabuoy…
- p. 419 10
New York University
Constant Level Balloons Final Report
March 1, 1951
- p. 421 …93.03
CJNSTANT LEVEL BALLOONS
FINAL REPORT
Constant Level Balloon Project
New York University
Prepared in…
- p. 424 …of the Department of
Meteorology of New York University.
A. Introduction and Statement of Problem
Contract…
- p. 426 …Essentially the system as developed at New York University con-
sists of a constant volume balloon…
- p. 430 …balloons as
developed and tested at New York University.
c. Telemetering From Balloon Systems
The second…
- p. 436 …Service fiights were carried out by New York UniTersit7 personnel
in conjunction with technical personnel from…
- p. 442 …Meteorological Analysis
As one phase of this project, New York University agreed to prepare
analyses of…
- p. 444 …b~1sh recorders for analysis at New
York University.
A total of 22 flights (two of…
- p. 445 …It is
this latter method which was used by the New York University
gro,p in…
- p. 450 …Research Division, College of Engineering, New York University,
Teclmical Re§ert 93 .02, Constant Level Balloons…
- p. 451 New York University
Constant Level Balloons
Section 1, General
November 15, 1949
11
- p. 453 …93.02
CONSTANT LEVEL BALLOONS
Section l
GENERAL
Constant Level Balloon Project
New.York University
Prepared…
- p. 455 …Further extensions are under consideration whereby New York Uni-
versity will supply standardized flight gear and…
- p. 456 …office and storage space was pro-
vided by New York University (Figures 1 and 2). Field…
- p. 461 …Smith, Inc., lfame.roneck, lrew York.
In these balloons, 4 and 8 mil sheets were heat…
- p. 468 …Colle~e of Engineering, New York
University, New York. N.Y •• 1948.)
There are three undesirable…
- p. 475 …A drawing of the temperature chamber designed
and built at New York University is shown in…
- p. 514 …the Electrical Eng-
ineering Department of New York University was adapted to re-
place or supplement…
- p. 531 New York University
Constant Level Balloons
Section 3, Summary of Flights
July 15, 1949
12
- p. 533 …93.02
CONSTANT LEVEL BALLOONS
Section 3
SUMMARY OF FLIGHTS
Constant Level Balloon Project
New York…
- p. 535 Introcluction
In November, 1946 the Research Division of the College of Eng.1neer1ng
of New York…
- p. 559 …o£ graduate studenta o£ meteorology at New York University.
By conatructing constant-pressure maps £ram the…
- p. 568 …A New York University AM-1 transmitter was
used to send out pressure data.
An automatic…
- p. 594 …Assuming gao-
strophic tlaw, members or a graduate class in meteorology at New York
- p. 597 …graduate ola.ss ot
meteorology at New York University (Figure 67). Using an airplane tix
FLIGHT…
- p. 601 New York University
Technical Report No. 1
Constant Level Balloon
April 1, 1948
13
- p. 603 …April 1, 1948
New York 63, New York
- p. 609 …the Re.search Division of the College of
Engineering of New York University entered into Contract…
- p. 640 …At a
meeting in New York an 20 .March 1947, the New York Air Space Sub…
- p. 671 …in the Electrical Engineering Laboratories
at New York University. ln previous tests, this has
provided clearer…
- p. 707 …Air Coordinating Committee, New York Sub-
committee on Airspace, Rules of the Air and Air Traffic…
- p. 708 …AIR COORDINATING COMMITTEE
NEW YORK SUBCOMMITTEE ON AIRSPACE
RULES OF 'ffiE AIR AND AIR TRAFFIC CONTROL…
- p. 709 …A period of six hours
will be the maximum duration of flight.
(4) New York University…
26.
Flight Release Altitude
No. Date. Point in ft. Recove!Z
EN-9 2/17/50 Vance AFB, Okla. 55,000 Washburn, Mo.
" -10 j/J/50 " " " 50,000
KN-1 4/25/50 Sedalia. AF'B, Mo. 50,000
II -2 5/12/50 " n II 55,000 Booneville, Mo.
n -3 5/26/50 It
" n 55,000 Warrensburg, Mo.
" -4 5/26/50 II
" II 40,000 Concordia, Mo.
11 -5 Hi. 6/2/50 " " " 50.000 Wapella, Ill.
" -5 Lo. 6/2/50 II
" II 40,000
" -6 Hi. 6/20/50 " " II 50,000 Ashtabula., Ohio
II -6 Lo. 6/20/50 " " II 40,000
II -7 Lo. 7/11/50 II II II 40,000 Springdale'· Ark.
" -1 Hi. 7/11/50 II II II 50,000
n-8 7/14/50 II II II 40,000 Loysville, Pa.
" -9 7/24/50 " II II 50,000 California, Mo •
" -10 8/31/50 II It II 50,000
II -11 9/14/50 II II II 48,000 Shelbyville, Tenn.
" -12 9/14/50 II u II 45,000 La Monte, Mo.
" -13 9/22/50 " " II 52,000
" -14 9/28/50 " " tl 48,000 Lo,1isianna, Mo.
11 -15 10/5/50 n n " 48,000
" -16 1o11o/5o " It tl 45,000
II -17 10/12/50 " " tl 45,000 Marshall, Mo.
" -18 10/17/50 " " IJ 45,000
II -19 10/26/50 " " II • 50,000 Dickson, Tenn.
In addition service flights were made from Watson Laboratories,AMC
Eatontown, N.J., :for testing of items of geophysical equipment during
the course of the project.
~1ring June, 1949, service flights were made from Luke AFB,
Arizona, simultaneously with those ma.de from Clovis AFB, New ivlexico.