Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 439 …it desired) Payload in~trumentation 1 ea. banner, 3 1 x 61 Data sheets. Weight sheets…
  • p. 550 …When mounted above the 'cloth identification banner, this chute also acts to minimize rrwe.y and…
  • p. 663 …A banner may be seen in Figure 30.. White banners seem to be the most generally…
  • p. 664 Figure 30 General Mills 20 foot balloon in flight, showine; banner and other flight train components.
  • p. 726 …description --------- Line leneth .---------------------------- Banner description --------------------------Ballast assembly .. description ______,.. Ballast • • .. • • '" • Total Equipment l~eight. • • • • ' Gross Load • • ' • • • • {56)
  • p. 860 …cutter cannon • • • • • • • • • 26 15 , Detail drawing of banner • • • • • • • • • • • • • • • • 28 16 • Typical service flight train (complete) • • • • • • • •• 30…
  • p. 881 …These are: (l) a banner, (2) a drag parachute, and (3) safety-weights. The banner is…
  • p. 882 …6' 12' NYU BALLOON PROJECT 3' 6' BANNER ~~~ Date~ 5-19-48 ED 48-5 6…
  • p. 937 2 ea. Parachutes ML-132 1 ea. Banner. 3' x 6' 4 ea. Data sheets 4…
  • p. 938 …description.______________ Drag chute ---------------------------- Banner description --------------- ---------- Ballast assembly - description -----------~-- Ballast • • • • • • Total Equipment i'ieight • • ' • • • • • • Gross Load • • • • • • • • • • • -86-
18.
When the system again descends to 2.5 11 ()(X), the pen arm comes into
contact ~iith the commutator contact and an electrical circuit is
closed through a squib in the load line. The load line is cut
and the load on the system falls six to eight feet before being
caught by a supplementary load line. Dnring this fall a rip
line pulls a hole one foot long in the side of the balloon and
the system descends using the partially inflated balloon to hold
the rate of descent to approximately 1200 f-'"/minute. This system
has been ,,sed successfully in .over 100 flights.
A drawing of the rip assembly is shown as FjP". 13. The cannon and
squib to cut the load line are shown as Fig. :t!i.
li;.~o~oT • A•ov&
A•o 8a1.ow c,...... ,.,
34' R. LINt__......
OF .100• TEST
BtUID!.O NYLON
WtTH 2' 5L.ACIC
APPENDIX
~S''LtM ..
2 SGU• F•• C..otem
;:r FIRED AT 2.0, ()()() f"T rtf
. .,_ fLIGHT hat"1101t 5M'Rllt
~ .
S: ld.,.LM,(cOILD ..) 1D ...-
PI.AGa 0#' ltT UC,WIIQI MAS
8££N CUT (BtDtD WlTH 1lfQO}
"'-Fi.leHT~DSwlltKRI'It
BALI.OOM ON FINAl,. llDCEIIT ,.;
2(\(?00 FT' 'IHU& III!1IIJtiN6
~1'1M6 TIME .. TME.-a\ LAM£&.
1M£ ttAl.F DEFI.AltD IW..LOCIK
ACT$ A& 11"5 OWN MRACK!111'.
_________ _j
Fig, lj
Balloon Hip Assembly

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.