“small beings”49 pages
- p. 17 …Others remain nonbelievers or
at least skeptical of the existence of alien beings and elusive vehicles…
- p. 19 …Moreover, operational necessity required that these balloons be launched during daylight
hours. It was therefore not…
- p. 30 …This has since grown from a minimal amount of debris recovered from
a small area to…
- p. 35 …This included, for example, a small
amount of missing "decimal files" from the 509th Bomb Group…
- p. 36 …This was a small section of the July Historical Report for the 509th Bomb Group
and…
- p. 37 …To believe that such operational and high-level security activity could be
conducted solely by relying…
- p. 39 …The foil-rubber material could not
be tom like ordinary aluminum foil can be tom... "
Sally…
- p. 40 …Although there does not appear to be much dispute that
Cavitt was involved in the material…
- p. 43 …Lt Col Cavitt described a small area of debris which appeared, "to
resemble bamboo type square…
- p. 72 …being per:ormed on these bodies.
The bodies were described as the body of a small…
- p. 99 …It should be noted that the period from approximately 1946 to 1950 is the least well…
- p. 105 …Several small projects were completed during ~1e mont.~ includine
signs on all the·office doors, a…
- p. 149 …Streett 1s
office recaumends against it on the ground that that is a
small enterprize down…
- p. 159 …I do not recall the incident being mentioned again as being any big
deal and I…
- p. 201 …We even simulated a small lightning strike over dry snow (just
from the snow blowing over…
- p. 258 …Big plastic
balloon with small auxiliary plastics," etc. "Watson Lab and
gear." "Followed" (inaudible) "receiver until…
- p. 261 …explain bodies or material that can't be
folded) by a sledge hammer.
Q: Let's…
- p. 328 …The witnesses have recalled small pink/purple "flowers" that appeared I to be
some sort of…
- p. 401 …b7 how ra*
the receiver •7 be re110ve~ .t'rows the pre~er. red height withqut…
- p. 443 …geostrophic wind (the latter being
derived under certain simplifying assumptions) and since the
geometry of the…
- p. 458 …Two designs which compro-
mise extreme cost (required for balloons of high internal pressure)
with small…
- p. 479 …This means that several hours might be required to fall through
the lanes of aircraft traffic…
- p. 484 …The change in drag effect may be realized by a decrease of
relative size of the…
- p. 487 (a)
Then:
(9)
or for small temperature differences:
(10) : - _L (.AI.)1-B T
the nega…
- p. 490 …gas of a balloon can be lost by:
leakage through small holes in the fabric or…
- p. 491 …for l:n•y small section of altitude is assumed
to be constant); and re.J…
- p. 506 in the preceding, section on diffusion end leakage the appendix
opening should be small. It can…
- p. 521 …is li~ited as indicated
above, small variations may be detected with the result
that it…
- p. 555 …being exposed about 10 hours
at cold temperature. (:S) During the floating period :many small oscilla…
- p. 565 …The very usef.ul information about be.llast flow was reported clearly, and
the principle of…
- p. 566 …Since the small external appendix with cardboard stiffeners was not
suitable for the large balloon, a…
- p. 580 …Following the initial activation at about 38,500 feet, small oscillations were
introduced into the flight…
- p. 614 …Figure 4 shows this appendix construction on a General M lls balloon which
is being inflated…
- p. 652 …At high altitudes, a difference of 40°C may
be expected in the temperature of the…
- p. 658 …To facilitate handling of the
line segments each length is prepared with a small hook on…
- p. 672 signals may be arranged so as to consume a very
small portion of -transmission time.
D…
- p. 738 …These values may
be compared with a diffusion loss of lift of the order
of magnitude…
- p. 742 …The constancy of level will be better the lower the
diffusion and the lower, therefore, the…
- p. 762 …te
.::mrcht:.se of small item£. A furth..:r rec:uest ~s been subr:rl tte…
- p. 783 …be of such a valve that
with a large r~diosonde frequency variation for a small…
- p. 785 …It is expected that this
equipment will be flown about 8 l-1ay. A description of…
- p. 815 …Before gear could be recovered, most of it had be~~tolen. Stations operating
at north hanger…
- p. 842 …Range started to slowly increase as did elevation with azimuth being
stationary. The echo remained beyond…
- p. 862 …By using this
stressed tape design, much larger loads may be carried than
the thin polyethylene…
- p. 874 …At this point, two small holes about
18" apart have been made, and the rip line…
- p. 881 …If thodolite stadia determinations are being
made, the banner can be used as one of the…
- p. 898 …laid out, A small amount of gas at very low pressure
Should be valved into the…
- p. 910 …The motor gears may be cleaned with
carbon tetrachloride and a small clean brush.
If the…
- p. 918 …Each combination of dots or dashes may be identified
by ear, and with a calibration chart…
The following is a list 'of equipnent needed for launching of
a single flight of this type:
(a) Launching EquiJ!b!!!t:
1 ea .sAt inst1"'1ctions (Operations Manual)
16.
· 2 ea. ellipticu shot bags (each filled vi th 100# of shot)
1 ea. u0 1 x6• Ground Cloth .
4 ea. sheets po1yethy1ene,.001" to .OOh", 4 1 x 4 1
1 ea. gas tan'k manifold vith pressure gages and valve
1 ea. rubber hoe,, 1 11 I.D.;l0 1 long With diffuser
1 ea. rubber tub~ 1/2" bore, 1/8 11 wall, &1 long
1 ea. solution balance
1 ea. inflation nozzle, ML-196 for rubber balloons
1 ea. tool kit complete with 2 sheath knives, so• cloth
. measuring tape-, brass wire, 1" MTstic tape, volt ohmmeter,
pliers, screwdrivers, inflation tools, flashlights, crescent
wrenches, soldering iron, compass, 2 open-end wrenches,
1•1/8 11 x 1-1/4" openings, 14" pipe wrench, spanner for
helium tank valves, etc.
1 ea. theodolite ML-247 with tripod ML-78 (optional)
1 ea. recorder, brush oscil1ograJil or other with amplifier.
1 ea. SCR-6$8 radio direction finder
1 ea. chronometer
(b) Flight Eg\dpment a
2 to $ tanks helilua
1 ea. balloon
2 ea. rolls acetate fiber scotch tape
1 ea. appendiX stiffeners (if appendix is to be used)
SOO# test nylon line
75# test linen twine
2 ea. 3$0 gram balloon ML-131A (for wind S>ck)
5 to 10 toggles or hooks
1 ea. radio transmitter
1 ea. pressure sensor (and temperature it desired)
Payload in~trumentation
1 ea. banner, 3 1 x 61
Data sheets.
Weight sheets
Revard tags·· (English, Spanish or other language)
(c) Tennination Eq11ipnent
1 ea. flight termibation switch
1 ea •. set rip rigging
2 ea •. cannons
2 ea. squibs (treated for high altitude)