Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 439 …it desired) Payload in~trumentation 1 ea. banner, 3 1 x 61 Data sheets. Weight sheets…
  • p. 550 …When mounted above the 'cloth identification banner, this chute also acts to minimize rrwe.y and…
  • p. 663 …A banner may be seen in Figure 30.. White banners seem to be the most generally…
  • p. 664 Figure 30 General Mills 20 foot balloon in flight, showine; banner and other flight train components.
  • p. 726 …description --------- Line leneth .---------------------------- Banner description --------------------------Ballast assembly .. description ______,.. Ballast • • .. • • '" • Total Equipment l~eight. • • • • ' Gross Load • • ' • • • • {56)
  • p. 860 …cutter cannon • • • • • • • • • 26 15 , Detail drawing of banner • • • • • • • • • • • • • • • • 28 16 • Typical service flight train (complete) • • • • • • • •• 30…
  • p. 881 …These are: (l) a banner, (2) a drag parachute, and (3) safety-weights. The banner is…
  • p. 882 …6' 12' NYU BALLOON PROJECT 3' 6' BANNER ~~~ Date~ 5-19-48 ED 48-5 6…
  • p. 937 2 ea. Parachutes ML-132 1 ea. Banner. 3' x 6' 4 ea. Data sheets 4…
  • p. 938 …description.______________ Drag chute ---------------------------- Banner description --------------- ---------- Ballast assembly - description -----------~-- Ballast • • • • • • Total Equipment i'ieight • • ' • • • • • • Gross Load • • • • • • • • • • • -86-
1,3.
D. Launching Services
During the course of the project balloon .flights were split into·
two general classifications, (a) research and (b) service.
Research flights were made to test balloon contrOls and telemeter-
ing systems developed under the contract.· A .tul.l report of these
research flights has been mac!e 1ft "Technical Report 9.3.02 1),
Section lii, Summar,r of Flights•
Service fiights were carried out by New York UniTersit7 personnel
in conjunction with technical personnel from the sponsoring ageney
to test geophysical equipnent deTeloped in Air Force laboratories.
The requirements for these fiights wre launching and tracking
of balloons to float at specified altitudes for short periods of
time (6 to 8 hours). Because of this short .tl.ight ·duration,
simplified plastic balloon STStas wre used. Balloons were
maintained aloft by ,,se of constant fixed ballast now, or ballast
was excluded entirely from the 87Stem. A typical night using
constant ballast flow at a rate slightl7 exceeding leakage losses
is shown as Fig. 8.
i-
~0
t.•
J...
.!
I
,. I I I I I 1 I I I l
I I
t-i. /'
I
11\ \ \ v i _\. \ .\ ... l. 1 . \ ~
1100 1100 a: 0100 otOO ~00 0100 1000 1- 1100 1100 1400
T••e-MIT
NYU BALLOON PROJECT FLIGHT 82
Barograph Record Of G.M. 20' Pla1hc Balloon W1th
534 gm/hr F1xed Balla1t Leak
ltiLIAUD AT ALAMOIOitDO,N.M.- OIIIMIT, 10 AUI 1141
DIIOINDID AT ltOIWILL,N.M.• 1110 MIT, 10 AUI 1141
DURATION• ill lite
Fig. 8
Balloon Flight Using Fixed Ballast Flow

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.