“Accord”29 pages
- p. 42 …the contract between NYU and Watson
Labs. According to Professor Moore, the "service flights" were composed…
- p. 75 …For e:wnple:.
• According to his son arid neighbors, Brazel was held
incommunicado by officials at…
- p. 77 …period of time, then retired or destroyed according to a general
schedule established by regulation. One…
- p. 106 …called on
all crash calls in accordance with AAF Regulation. In the past, the
F.I…
- p. 172 …vehicle with
a rear box." So, apparently, according to Marcel's version of the story (and…
- p. 177 …page 61. "According to Lewis Rickett, one of
the CIC Agents, he, with the commander of…
- p. 179 …his normal
unclassified duties at Roswell, but according to him the crash and recovery had never…
- p. 217 …done with the Constant
Altitude balloon projects. According to Dr. Spilhaus, he said
you would be…
- p. 225 …anything like that in this area.
A: According to Tibbetts, the A Model had bit aerodynamic…
- p. 226 …These, according to Tibbetts, weren't distributed until something
like November of 1945. As far as…
- p. 268 …Initially we had sonobouy, according to Crary. We
initially were flying radar targets on the balloons…
- p. 307 …me that I have the following rights according to the Sth Amendment of the US Constit…
- p. 322 New York University, in accordance with contractual requirements, produced
monthly progress reports, technical reports, and final…
- p. 324 …This procedure, according to Moore, was employe~ on
flight nos. 3 and 4, but it was…
- p. 325 …the pressure cutoff switch (Atch 3).
2. According to Brazel's July 8 statement, the debris…
- p. 326 …the vicinity of Roswell, New Mexico."36 According to the sole :living
participant in the recovery…
- p. 327 …make an
identification, which he apparently did. According to Captain (now Colonel)
Trakowski, the officer who…
- p. 421 …Balloon Project
New York University
Prepared in Accordance with provisions of Contract
W28-099-ac-241…
- p. 430 …voltage of
a self•excited oscillator in accordance with the audio signal.
This provides the freq…
- p. 453 …Balloon Project
New.York University
Prepared in accordance with provisions of contract
W28-099-ac-241…
- p. 528 …the lower ring {G) before each flight according
to the weights of the ballast assembly and…
- p. 533 …Project
New York Univerai ty'
Prepared tn Accordance with provisions of Contract
W28-Q99-ac- 241…
- p. 579 …Indeed, the
entire 3000 grams available was expended at this time, according to the evi-
dence…
- p. 597 …s anticyclonic, this
seems to be in accordance with the idea of super-geostrophic flow associated…
- p. 603 …93
Prepared in Accordance with Provisions of ContraQ\
W28-099-ac-241, between
Watson Laboratories, Red…
- p. 758 …93
Preoared in Accordance with Provisions of Contract
w28-099 a.c-~41, between
Watson Laboratories…
- p. 830 …II
Prepared in Accordance w1 th Proneio~a ot Contract
W28-09& ao-t41, bebeft
Wet1011…
- p. 857 …Project
New York Unive-rsity
Prepared in Accordance with provisions of Contract
W28-099-ao-241…
- p. 922 …or at the pressure values corresponding to regular
height intervals according to the standard at-
mosphere…
Technical Report No. 93.03
CJNSTANT LEVEL BALLOONS
FINAL REPORT
Constant Level Balloon Project
New York University
Prepared in Accordance with provisions of Contract
W28-099-ac-241, between
Watson Laboratories, Red Bank, New Jersey
and
New York University
The research reoorted in this doc,,ment has been made possible
through support and sponsorship extended by the Geophysical
Research Directorate of the Cambridge Research Laboratories,
~~, u. S. Air Force, under Contract No. W28-099-ac-241.
It is ~'blished for technical information only and does not
represent recommendations or conclusions of the sponsoring
agency.
Prepared by: ~~. Project Director
~I'W~
Approved by: Harold K.· Work,
Directo~ of the Research Division
College of Engineering
New York University
1 March 1951
New York 53, New Tork