Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 42 …the contract between NYU and Watson Labs. According to Professor Moore, the "service flights" were composed…
  • p. 75 …For e:wnple:. • According to his son arid neighbors, Brazel was held incommunicado by officials at…
  • p. 77 …period of time, then retired or destroyed according to a general schedule established by regulation. One…
  • p. 106 …called on all crash calls in accordance with AAF Regulation. In the past, the F.I…
  • p. 172 …vehicle with a rear box." So, apparently, according to Marcel's version of the story (and…
  • p. 177 …page 61. "According to Lewis Rickett, one of the CIC Agents, he, with the commander of…
  • p. 179 …his normal unclassified duties at Roswell, but according to him the crash and recovery had never…
  • p. 217 …done with the Constant Altitude balloon projects. According to Dr. Spilhaus, he said you would be…
  • p. 225 …anything like that in this area. A: According to Tibbetts, the A Model had bit aerodynamic…
  • p. 226 …These, according to Tibbetts, weren't distributed until something like November of 1945. As far as…
  • p. 268 …Initially we had sonobouy, according to Crary. We initially were flying radar targets on the balloons…
  • p. 307 …me that I have the following rights according to the Sth Amendment of the US Constit…
  • p. 322 New York University, in accordance with contractual requirements, produced monthly progress reports, technical reports, and final…
  • p. 324 …This procedure, according to Moore, was employe~ on flight nos. 3 and 4, but it was…
  • p. 325 …the pressure cutoff switch (Atch 3). 2. According to Brazel's July 8 statement, the debris…
  • p. 326 …the vicinity of Roswell, New Mexico."36 According to the sole :living participant in the recovery…
  • p. 327 …make an identification, which he apparently did. According to Captain (now Colonel) Trakowski, the officer who…
  • p. 421 …Balloon Project New York University Prepared in Accordance with provisions of Contract W28-099-ac-241…
  • p. 430 …voltage of a self•excited oscillator in accordance with the audio signal. This provides the freq…
  • p. 453 …Balloon Project New.York University Prepared in accordance with provisions of contract W28-099-ac-241…
  • p. 528 …the lower ring {G) before each flight according to the weights of the ballast assembly and…
  • p. 533 …Project New York Univerai ty' Prepared tn Accordance with provisions of Contract W28-Q99-ac- 241…
  • p. 579 …Indeed, the entire 3000 grams available was expended at this time, according to the evi- dence…
  • p. 597 …s anticyclonic, this seems to be in accordance with the idea of super-geostrophic flow associated…
  • p. 603 …93 Prepared in Accordance with Provisions of ContraQ\ W28-099-ac-241, between Watson Laboratories, Red…
  • p. 758 …93 Preoared in Accordance with Provisions of Contract w28-099 a.c-~41, between Watson Laboratories…
  • p. 830 …II Prepared in Accordance w1 th Proneio~a ot Contract W28-09& ao-t41, bebeft Wet1011…
  • p. 857 …Project New York Unive-rsity Prepared in Accordance with provisions of Contract W28-099-ao-241…
  • p. 922 …or at the pressure values corresponding to regular height intervals according to the standard at- mosphere…
received satisfactory results when the number of targets was increased to belo/een
3 and 5.30 Interestingly, during July of 1948, a similar test would be made at
Alamogordo AAF by another organization.31 This test confirmed Moore's theory
that when targets were increased to at least three, satisfactory returns were
received by the radar. This procedure, according to Moore, was employe~ on
flight nos. 3 and 4, but it was only marginally successful. This prompted Mioore
and his associates to configure the two remaining flights of Alamogordo I, flights
#5 and #6, with radiosonde transmitters.
I
For these two final flights, Moore devised a method of manually determi!ning
azimuth and elevation, in the absence of a radisonde recorder, by counting dicks
as pressure-sensitive contacts closed. NYU Technical Report No. 1 shows 1
two
"interpretations" of the data which confirm that manual calculations were q.sed.
In regard to flight no. 5, it appears there was a typographical error in Techpical
Report No. 1, Table VII, for the time of launch which is erroneously listed as 1517
MST, contrary to figures 32 and 33 in Technical Report No.1 and Crary's qiary
(Atch 6). The correct time of launch for flight no. 5 appears to be 0516 MST. With
the launching of flight no. 6 at approximately 0530 on June 7, the NYU group
departed Alamogordo via a B-17 for Newark AAF, NJ. NYU flight nos. 1~ are
summarized below:
SUMMARY OF FLIGHTS 1--6
Flight no. Date Launch Site Configuration Landing: Site
1 4/3/47 Bethlehem, PA See NYU Tech. Report Sandy Hoof<, NJ
No. 1, Table VII
2 4/18/47 Bethlehem, PA See Appendix NYU Unknown
Special Report No. 1
3 5/29/47 Alamogordo, NM Same as flight no. 2* Unknown
4 6/4/47 Alamogordo, NM Same as flight no. 2* Unknown
5 6/5/47 Alamogordo, NM See NYU Tech. Report East of Roswell, NM
No. 1, Table VII
6 6/7/47 Alamogordo, NM See NYU Tech. Report South of H'ghrolls, NM
No. 1, Table VII
* Depictions of flight nos. 3 and 4 are not provided in the NYU reports. According to NYU Progress ~eport
No. 6, Section II, p. 5, the equipment to be used for the Alamogordo field trip in June was consistent with
the depiction of flight no. -2. This information also concurred with Crary's partial description of flight no. 4
in his diary. ·
Note: An attempt to launch a balloon-train assembly which would have been NYU flight no. 3 was made
on May 8, 1947, but due to strong winds, restraining lines failed before the acoustical payload was attached.
Since the launch was unsuccessful, no flight number was assigned.
30. Ibid.
31. Rprt, Holloman AFB, "Progress Summary Report on U.S.A.F. Guided Missile' Test
Activities," Vol 1, Aug 1, 1948.

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.