Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 14 …New York University, Constant Level Balloons, Final Report, March 1, 1951 11. New York University, Constant…
  • p. 18 …Developed partly under contract with leading scientific institutions-such as New York University (NYU), Woods Hole…
  • p. 19 …New York Times, "Balloon Staggers Down to Brooklyn Tavern, Hooks Itself to Roof and Upsets Decorum…
  • p. 41 …testing "constant level balloons" and a New York University (NYU)/Watson Labs effort that used" ... meteorological…
  • p. 72 …Foundation then on 23rd Street in New York City. The pathological examination disclosed a human with…
  • p. 148 …i.L?...D"- Erun_2 o:f New York - Gm. ~ advised he would let hi!:: know…
  • p. 183 …There was a project run by New York University, out ofHoDoman at that time. It was…
  • p. 206 …When we heard the news back in New York, w.e joked that they probably found…
  • p. 213 …early July 1947, to observe the New York University balloon group. The "Roswell Incident" occurred after…
  • p. 217 …he was Director of Research at New York University at that time. Q: We have gone…
  • p. 220 …But anyway, Istvan initially went to New York hunting for a source of supply and came…
  • p. 222 …I've reviewed the New York University documents and there's a very clear depiction in…
  • p. 233 …you to join the staff at New York University, or to continue your studies there? A…
  • p. 234 …So you went to New York University when? A: Right after had already started. a copy…
  • p. 237 …You went on board at New York University, and you immediately set out, as documented in…
  • p. 240 …So at this time in New York University you were cleared but you had no need…
  • p. 243 …In the New York University report it says that you were provided two Japanese balloons. A…
  • p. 244 …they have reward tags, "Return to New York University," or "Return to Roswell Army Air Field…
  • p. 247 …so you made your plan in New York to fly •.• Your primary research was the acoustical…
  • p. 261 …The New York University reports are very voluminous. There are three big bound volumes. I have…
  • p. 275 …Charlie Moore and his crew from New York University. Q: You said you went in July…
  • p. 319 …W28-099-ac-82) for the acoustical equipment, and to New York University (NYU) for the…
  • p. 320 …NEW YORK UNIVERSITY "BALLOON GROUP" From September 30, 1946, until December 31, 1950, the Research Division…
  • p. 322 New York University, in accordance with contractual requirements, produced monthly progress reports, technical reports, and final…
  • p. 326 …worlk and preparing to return to New York City, a train of events began to unfold…
  • p. 327 …Kevin Randall and Donald Schmitt, UFO Crash at Roswell (New York, 1991), p. 103. 39. Intvw…
  • p. 331 …Drawing-New York University Flight No. 2 4. 2 Depictions of AN I CRT-1 Sonabuoy…
  • p. 419 10 New York University Constant Level Balloons Final Report March 1, 1951
  • p. 421 …93.03 CJNSTANT LEVEL BALLOONS FINAL REPORT Constant Level Balloon Project New York University Prepared in…
  • p. 424 …of the Department of Meteorology of New York University. A. Introduction and Statement of Problem Contract…
  • p. 426 …Essentially the system as developed at New York University con- sists of a constant volume balloon…
  • p. 430 …balloons as developed and tested at New York University. c. Telemetering From Balloon Systems The second…
  • p. 436 …Service fiights were carried out by New York UniTersit7 personnel in conjunction with technical personnel from…
  • p. 442 …Meteorological Analysis As one phase of this project, New York University agreed to prepare analyses of…
  • p. 444 …b~1sh recorders for analysis at New York University. A total of 22 flights (two of…
  • p. 445 …It is this latter method which was used by the New York University gro,p in…
  • p. 450 …Research Division, College of Engineering, New York University, Teclmical Re§ert 93 .02, Constant Level Balloons…
  • p. 451 New York University Constant Level Balloons Section 1, General November 15, 1949 11
  • p. 453 …93.02 CONSTANT LEVEL BALLOONS Section l GENERAL Constant Level Balloon Project New.York University Prepared…
  • p. 455 …Further extensions are under consideration whereby New York Uni- versity will supply standardized flight gear and…
  • p. 456 …office and storage space was pro- vided by New York University (Figures 1 and 2). Field…
  • p. 461 …Smith, Inc., lfame.roneck, lrew York. In these balloons, 4 and 8 mil sheets were heat…
  • p. 468 …Colle~e of Engineering, New York University, New York. N.Y •• 1948.) There are three undesirable…
  • p. 475 …A drawing of the temperature chamber designed and built at New York University is shown in…
  • p. 514 …the Electrical Eng- ineering Department of New York University was adapted to re- place or supplement…
  • p. 531 New York University Constant Level Balloons Section 3, Summary of Flights July 15, 1949 12
  • p. 533 …93.02 CONSTANT LEVEL BALLOONS Section 3 SUMMARY OF FLIGHTS Constant Level Balloon Project New York…
  • p. 535 Introcluction In November, 1946 the Research Division of the College of Eng.1neer1ng of New York…
  • p. 559 …o£ graduate studenta o£ meteorology at New York University. By conatructing constant-pressure maps £ram the…
  • p. 568 …A New York University AM-1 transmitter was used to send out pressure data. An automatic…
  • p. 594 …Assuming gao- strophic tlaw, members or a graduate class in meteorology at New York
  • p. 597 …graduate ola.ss ot meteorology at New York University (Figure 67). Using an airplane tix FLIGHT…
  • p. 601 New York University Technical Report No. 1 Constant Level Balloon April 1, 1948 13
  • p. 603 …April 1, 1948 New York 63, New York
  • p. 609 …the Re.search Division of the College of Engineering of New York University entered into Contract…
  • p. 640 …At a meeting in New York an 20 .March 1947, the New York Air Space Sub…
  • p. 671 …in the Electrical Engineering Laboratories at New York University. ln previous tests, this has provided clearer…
  • p. 707 …Air Coordinating Committee, New York Sub- committee on Airspace, Rules of the Air and Air Traffic…
  • p. 708 …AIR COORDINATING COMMITTEE NEW YORK SUBCOMMITTEE ON AIRSPACE RULES OF 'ffiE AIR AND AIR TRAFFIC CONTROL…
  • p. 709 …A period of six hours will be the maximum duration of flight. (4) New York University…
apparatus and materials for the project, so if he said that it was debris from the project, rm sure
that's what it was. He was not concerned with a breach of security for the project.
Concerning the name Maj Pritchard, he may have worked for me but I don't recall him. I have no
knowledge of any counterintelligence. or intelligence persons on the project or associated with my
directorate at Watson or Cambridge Labs. When we took over the project, we were aware of the
sensitivity of the project-we were aware that we were working in the open-it was a weakness of
security because the activity could be obselved. I never obsCJVed any of the balloon "trains" but I
did see some of the early reflectors. Some of the reflectors were procured from sources out of
normal channels. Some of the contractors lined up were not quite in concert with typical Signal
Corps practices and procedures. Jack Peterson was vety energetic and could make procurement
actions take place. Ed Itsvan, who I believe actually arranged for production for some of the
reflectors, actually went to a toy manufacturer in New Yark city to get some. It was kind of a
standing joke. I remember that some of the prototype and preproduction targets had this pink or
pw-plish tape holding the material to the balsa beam. This tape had flowers and other designs on it.
The reflectors were probably made starting in late 1944 but I do not recall how long the
production run was. I do not recall any other specific attributes but they were geometrically and
structurally simple.
I am not part of any conspiracy to withhold information from either the US government or
American public. There is no classified information that I am withholding related to this inquiry
and I have never been threatened by US Government persons concerning refraining from talking
about this situation .
SIGNED:
~I
WITNESS(s):
Subscn'bed and sworn to before me, a
person authorized to administer oaths
this
~'l,ltlt day of June 1994 a~ , VA
~~~~USAF
MALJ

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.