Documents / Official release

Gemini VII Air-to-Ground Transcript Volume I: 5011500_VolumeI

· 341 pages · text by OCR, confidence 100%

No summary written yet.

308 CONFIDENTIAL 101:51:56 CC Roger. 101:52:08 CC The Quantity Read switch to the FUEL CELL O₂ position. 101:52:12 C FUEL CELL O₂. 101:52:13 CC Roger. We've got some data for the Command Pilot, if he would like to listen. 101:52:18 C Go ahead. 101:52:19 CC Okay. The fuel cell status. Stack times have been balanced within .5 to .75 amps for the mission with the exception of 2-Charlie. Charlie has been a hot stack both prelaunch and flight. A plot of percent total load sharing versus time shows the following figures: Prelaunch, 18.6 percent; 20 hours, 20.0 percent. Quantity Read to the FUEL CELL H₂ position, please. 40 hours, 20.0 percent; 60 hours, 20.0 percent; 80 hours, 21.0 percent; 100 hours, 20.5 percent. Data indicates load sharing has not changed deprecably since lift-off. Looks like we have a good stable fuel cell system. The G-Stacks normally share a larger percent of load since the coolant fluid is higher in these stacks. Over. 101:53:55 C Roger. Thank you very much. 101:53:57 CC Roger. 101:54:13 CC Quantity Read switch off, please. 101:54:15 C Quantity Read off. Understand you want me to monitor H₂ and keep above 310 tonight. 101:54:30 CC What we'd like you to do is - you don't have to monitor it, you - it shouldn't drop any lower than that point. 101:54:38 C Okay. If it does, you all give us a call, will you? 101:54:40 CC That's affirmative. People on the ground will watch it for you. CONFIDENTIAL

Cases discussed

About this file

Official release, from the nara collection. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model (mean confidence 100%); expect the odd misread word. 341 pages are in the text index: search them above, or from the library's search.