Documents / Official release

Gemini VII Air-to-Ground Transcript Volume I: 5011500_VolumeI

· 341 pages · text by OCR, confidence 100%

No summary written yet.

268 CONFIDENTIAL 94:17:14 P Tape playback is on CONTINUOUS. 94:17:21 P Roger. 94:17:22 CC And you can get out your flight plan update book. I've got two items for you. 94:17:26 P Roger. 94:17:29 CC For your information, the Spacecraft VI sim flight is underway. 94:17:31 P Roger. We just passed over the Cape and with the telescope we could see them working on 19. 94:17:42 CC Very feverish activity, isn't it? 94:17:43 P Right. 94:17:59 P Okay. Go ahead with the update. 94:18:02 CC Roger. The first item is a deletion. D-9 at 96:11:35 is deleted. 94:18:16 P Roger. Understand the D-9 is deleted. 94:18:19 CC We'll get that later today. A new one in that same area is D-5: 96:13:00; Test Number 2. I have the instructions for that test when you're ready to copy. 94:18:34 P Test Number 2. 94:18:35 P Go ahead. 94:18:38 C Go ahead. 94:18:41 CC Okay. Number 1: calibrate on Venus; Number 2: if calibration successful, release the Cal button, track to occultation and report number of gain wheel turns to maximum from the calibration setting. Do you copy? 94:19:14 P Roger. We have it. 94:19:15 P Roger. Got it. CONFIDENTIAL

Cases discussed

About this file

Official release, from the nara collection. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model (mean confidence 100%); expect the odd misread word. 341 pages are in the text index: search them above, or from the library's search.