Documents / Official release

Gemini VII Air-to-Ground Transcript Volume I: 5011500_VolumeI

· 341 pages · text by OCR, confidence 100%

No summary written yet.

CONFIDENTIAL 265 GUAYMAS Time Speaker Message 94:05:27 CC Gemini VII, Guaymas CAP COM. 94:05:33 P This is VII. Go ahead. 94:05:34 CC Roger. We'd like you to turn your T/M switch to REAL-TIME and ACQ-AID. 94:05:39 P Roger. Go to REAL-TIME and ACQ. 94:05:42 CC And place the adapter C-Band in CONTINUOUS. 94:05:48 P Roger. C-Band is CONTINUOUS. 94:05:55 CC Everything looks real good here on the ground, Gemini VII. We have nothing else for you. We'll be standing by. 94:06:00 P Roger. 94:06:51 CC Gemini VII, Guaymas CAP COM. 94:06:54 P Go ahead, Guaymas. 94:06:55 CC We would like an on-board readout of Squib 1 and 2 and the common control bus, please. 94:07:03 P Roger. Common control bus is reading 25 volts at the present time. 94:07:08 CC Roger. 94:07:12 P Squib 2 reads about 25.7, Squib 1 reads about 25.7. 94:07:19 CC Roger. Thank you. TEXAS Time Speaker Message 94:09:10 CC Gemini VII, this is Texas CAP COM. 94:09:14 P Go ahead, Texas. CONFIDENTIAL

Cases discussed

About this file

Official release, from the nara collection. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model (mean confidence 100%); expect the odd misread word. 341 pages are in the text index: search them above, or from the library's search.