Documents / Report

Scientific Study of Unidentified Flying Objects (the Condon Report, complete, three volumes)

University of Colorado · 1969-01 · 1497 pages · text from the file's own layer

This is the final report of the Scientific Study of Unidentified Flying Objects, conducted by the University of Colorado under Air Force contract F44620-67-C-0035, with Edward U. Condon as scientific director and Daniel S. Gillmor as editor. It was submitted to the National Academy of Sciences on 15 November 1968 for review. The report includes field studies, photographic and radar analyses, case studies, historical chapters and appendices such as the Robertson Panel report and the Twining letter.

of the November 9 power failure. The backup relay on the
line l.!2~H)lJ was set ill 19CJ:, to operate at about ,)75 MW and
tile llJO r·lvar at CI btls voltage of 248 k'l unli, although the
load-calTYlIlg capacity of each of '_hese lines is consider-
ably higher, it was necessary to set each backup relay to
operate at a power level below the line's capacity to pro-
viJe the ucsircJ protection unli to achieve cooruination with
other relays on the system. This setting Was believed to
be :,ufficielltl>' high to provide a safe margin above expected
power flows.
I~hell till:: backup rday:: Were moui fied and the power
levels were set in 1963, the .loal! Oil the northbound Jines
frurn Beck '10. 2 was appreciably lower than the trip setting
of the back~Jp relay. Recently, the lJIegah'att dod JIIegavar
loadings on the transmi ssion lines from b<:ck to the north,
because of emergency outages in ,,\ new Ontonio Hydro stcam-
electric plant, have been very heuvy. This temporary situ-
ation produl.:f.:u a deficiency in Ontario gcnt:ration, with the
resul t that a !le[1vh'r inflow of power from the Uni ted States
inten:ollncctions was necessary.
Acconlill& to Ontario Ilydro spokesmen, the average flow
had reached 356 M": (and approximatel)' 160 Mvar) ill the 1il1('
that trippcu out first, but momentary fluctUilt iOIl in the
flol\' is normal. Therefore, at 5: 16 p.IlI., as alreaJy mcn-
hOlll'J, tl:(' pO\~l'r flow apparently reached the level at which
till' relay \~as set; it funet iOJ1Pc! ill accordance wi til j t~;
setting, and its circuit brcaker trippeu out the line. Ontario
1I)'uro also informed the I;PC that .its operating personnel Were
1'ot ilh'arc that the relay on line Q2V13IJ was set to opc'rat<: at
a load uf 375 MW,
t,. Conclusions
Uf llll physical cff':dS 1.:1a1",cd to IJl' UUl' to Lllc pncsencc of UFOs,
the alleged malfullction of <lutomobill' motors is perhups the most puzz.ling.
1'71
of the November ~ power f<J il ure. The back up re 1ay 011 the
line li2\11lLi \Nas set in 196:5 to operate at about .)7S MW and
the 1I.JlJ r·lvar at Cl blls voltage of 248 kl/ <InLi, although the
load-calTYlng <.;apacl ty of each of '.ht:sc lines is consider-
ably hi.gher, it was necessary to set each IHickup re lay to
operate at a power lev[l below the Lille's capacity to pro-
viJe the ucsirc,1 protection anJ to achieve cooruinatlon with
other relays on the s)'!item. Th.is setting was believed to
be ~ufficielltly high to prOVide a safe margin above expected
power flows.
lih()ll the tJackup rday~ Were maul fied ancl the power
Levels \(cre set j 11 1 ~)b~, the .loau 011 the northbound Jines
frorn Ilec:k '10. 2 was appreciably lower thiln the trip setting
uf the back~lp n:lay. Recently., the megawatt iind JIIegavar
loadings on the transmission lines frum [leek to the north,
because of t'lIIcrgcncy outages in ct new Ontalio Hydro steam-
electric plant, h;1VC been very heuvy. This temporary situ-
ation produc()u a defici.ency in (lntClriu generation, with the
resul t that a heavll'r inflow of power from the Unl ted States
intelconncctions was l1l~cessary.
Accor,ling to Ontario Ilydro spokesmen, the average flow
haJ read.cd 3S11 MW (und approximatel)! lbO Mvar) ill the lin('
that trippcu out first, but momentary fluctuation in the
flOl,' is /101'111111. Therefore, at S: 16 p.llI., :IS ulreauy mCI1-
t loneu, tl~c pO\~l'r f1uw upparently n'(H:iJc,1 the loved at whit.;h
thl' relay has set; it fUllctioJl':c1 ill fll'l'uruuncc with jt~;
setting. ami it~ clT'l'lllt breaker trippeu aLIt thc line. Ontario
11)·ul'o also inforllleu the H't: that its opcrat ill~ )1el'solllld Wen:
not ilh·are that thl' l'cll.l)' on Jine Q2~IlI) was set to ope·nil..., at
a 10au of 375 MW.
(1. Conclusions
Uf il11 physica I eff",:t:; daiml'u to Ill' JUl' to Lhc pl'c&ence of UFOs,
the ailelolE'U malfullction of <lutotnobi 1(' motors is pl'1'1wp5 the most puzzling.
1'71

Cases discussed

About this file

Report, from the classic collection. The PDF is mirrored here; the original link is under it. 1497 pages are in the text index: search them above, or from the library's search.