Documents / Document

Collapse of U.S. 35 Highway Bridge, Point Pleasant, West Virginia, December 15, 1967 (HAR-71/01)

National Transportation Safety Board · 1970-12-16 · 202 pages · text by OCR, confidence 99%

No summary written yet.

- 26 - FIG. 4 MASTER CHART FOR LOCATION OF LABORATORY SPECIMENS TEST SPECIMEN GROUP DESIGNATIONS NORTH (UPSTREAM) TRUSS DESIGNATION "N" G I θ CABFAE F E E D C TEST SPECIMEN GROUP DESIGNATIONS B G I I C D HD F D D ED B D E E DHC F GROUP A GROUP B GROUP C GROUP D GROUP E GROUP F GROUP G GROUP H GROUP I 1. LEBARS NO 310 AND 33 PORTION OF CHAIN BEAM POST, DATED UTL. AND C3-CHN TO NBS SEE FIGURE 5a SHIPPED TO 999 FOR FATIGUE TESTS SEE FIGURE 5b SHIPPED TO 999 LAB FOR MODEL TESTS AND OTHER SPECIAL INVESTIGATIONS SEE FIGURE 5c SHIPPED TO BATTLEFIELD FOR NOT LAMINATED OTHER SPECIAL INVESTIGATIONS SEE FIGURE 5d SHIPPED TO US STEEL FOR FULL SCALE EYE-BAK TESTS SHIPPED TO LOUISVILLE FOR FULL SCALE EYE-BAK TESTS SHIPPED TO NBS AND NBS FOR FUTURE FULL SCALE TESTS (FULL EYE-BAK) NOTES: 1. FOR DETAILS OF SPECIMEN POSITION AND DIMENSIONS, SEE APPENDIX A 2. FOR SPECIMEN SUBDIVISION AND SUBSEQUENT SHIPMENT, SEE FIGURES 5a-5e SOUTH (DOWNSTREAM) TRUSS DESIGNATION "S" [illegible]

About this file

Document, cited by the archive. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model (mean confidence 99%); expect the odd misread word. 202 pages are in the text index: search them above, or from the library's search.