Documents / FOIA release

/specialCollection/BerlinWall/1961-Summer/1961-07-12c.pdf

Central Intelligence Agency · 163 pages · text by OCR, confidence 100%

No summary written yet.

TOP SECRET - 12 - B-52 force without degrading the total alert posture. 5. Summary of Personnel Augmentation and Costs a. A garrison and civilian airlift: (1) The capability for a garrison airlift exists now. Increased Air Force costs: $2 M for fighter aircraft deployment to Europe. (2) The US unilateral share (50%) of the quadripartite (QBAL) civilian airlift as planned, for a period of 90 days: Augmentation Costs Air Force 2,946 (plus 219 civ) $64 M b. Naval harassment and blockade of Bloc shipping: Augmentation Costs FY 62 Navy: For harassment None None For pacific) blockade ) 121,900 $2,014.4M For full ) blockade ) c. A six-division ground action in Europe: Augmentation Costs FY 62* Army 483,000 Air Force 60,345 (plus 6,149 civ) Navy 3,100 546,445 (plus 6,149 civ) *Over-all cost estimates being refined. d. Maximum TOP SECRET

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model (mean confidence 100%); expect the odd misread word. 163 pages are in the text index: search them above, or from the library's search.