Documents / FOIA release

Mkultra Subproject 52 (108 Documents with Pubdates from 560614 to 64062 4)

Central Intelligence Agency · 1956-06-14 · 493 pages · text by OCR, confidence 97%

No summary written yet.

52-79 4 April 1958 MEMORANDUM FOR: THE COMPTROLLER ATTENTION : Finance Division SUBJECT : MKULTRA, Subproject 52 Additional Authorization No. 4 Under the authority granted in the Memorandum dated 13 April 1953, from the DCI to the DD/A and the extension of this authority in subsequent memoranda, Subproject 52 was previously approved. Under the same authority an additional sum of $2,000.00 has been authorized to cover the Subproject's expenses (thereby bringing to a total of $2,000.00 funds obligated during FY 58), to be charged to Allotment 8-2502-10-001. A Chief TSS/Chemical Division APPROVED FOR OBLIGATION OF FUNDS: Research Director Date: Distribution Orig & 2 - Addresses 1 - TSS/OC 1 - TSS/FASB 1 - TSS/SRB 2 - TSS/CD TSS/CD: [redacted] (4 April 58)

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model (mean confidence 97%); expect the odd misread word. 493 pages are in the text index: search them above, or from the library's search.