Documents / FOIA release

Mkultra Subproject 52 (108 Documents with Pubdates from 560614 to 64062 4)

Central Intelligence Agency · 1956-06-14 · 493 pages · text by OCR, confidence 97%

No summary written yet.

52-73 13 October 1958 MEMORANDUM FOR: THE COMPTROLLER ATTENTION : Finance Division SUBJECT : MULTRA, Subproject 52, Additional Authorization No. 5 Under the authority granted in the Memorandum dated 13 April 1953, from the DCI to the DD/A and the extension of this authority in subsequent memoranda, Subproject 52 was previously approved. Under the same authority an additional sum of $3,000.00 has been authorized to cover the Subproject's expenses and is to be charged to 9-2502-75-902. A [redacted] Chief TSS/Chemical Division APPROVED FOR OBLIGATION OF FUNDS: A [redacted] Research Director Date: [illegible] I CERTIFY THAT FUNDS ARE AVAILABLE: 1 OCT 1958 OBLIGATION DATE: 901 CHARGE TO A/C: 9-2502-75-902 AUTHORIZING OFFICER Distribution: Orig & 2 - Addressees 1 - TSS/OC 1 - TSS/FASB 2 - TSS/CD

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model (mean confidence 97%); expect the odd misread word. 493 pages are in the text index: search them above, or from the library's search.