Documents / FOIA release

(EST Pub Date) the Office of Scientific Intelligence, 1949-68- (Volume Three, Annexes Viii, Ix, and X)

Central Intelligence Agency · 1972-06-01 · 243 pages · text by OCR, confidence 99%

No summary written yet.

TOP SECRET pass on each project for possible conflict and coordination with proposals of other DDI elements --- XII. Summary In summary, gains from external contracting have not come easily or cheaply. Experience has shown that an external support program cannot be set up to run itself; considerable money and time of analysts' must be spent in support of existing contracts and in searching for new contractors. The intelligence point of view does not seem to come easily to those outside the intelligence community, especially to the highly specialized technical experts that are needed, so that a large amount of orientation is usually required. It has often been pointed out that the contract-analyst manhour costs considerably more than an in-house one (even including internal overhead) and that contract monitoring costs (including the time of the project officer) increase the discrepancy. Yet - 48 - TOP SECRET

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model (mean confidence 99%); expect the odd misread word. 243 pages are in the text index: search them above, or from the library's search.