Documents / Document

Apollo 11 Technical Crew Debriefing, Volume 1 (scan)

NASA via ibiblio · 1969-07-31 · 251 pages · text by OCR

This is Volume 1 of NASA's Apollo 11 Technical Crew Debriefing, dated July 31, 1969. The Mission Operations Branch of the Flight Crew Support Division at the Manned Spacecraft Center in Houston prepared it, and it was originally classified Confidential. In it Armstrong, Aldrin and Collins go phase by phase through suiting, launch, powered flight, Earth orbit and lunar surface activities. They comment on suit fit, vibration, checklists, lunar dust, footing and poor sleeping conditions in the lunar module. A section titled Visual Sightings appears in the table of contents.

  • p. 30 …It was impossible to read an effect on any indicator in the cockpit. COLLINS This is…
  • p. 38 …the expected altitude was 174 and we read 176. The EMS was 3.3 plus. ARMSTRONG…
  • p. 39 …There's no way that the EMS could read 99.1 at docking. As I recall…
  • p. 40 ## CONFIDENTIAL Then I thrusted minus X until the DELTA-V counter read minus 100.5. I…
  • p. 46 …Neil and I both read a memo put out by MPAD, saying that for some failure…
  • p. 50 …We gave daily dosimeter readings, which as far as I'm concerned fall in a sort…
  • p. 51 …COLLINS And the dosimeter we just gave them a once-a-day reading on that dosimeter…
  • p. 68 …When you read me the numbers, you didn't note that I read star number 2…
  • p. 79 …The cabin temperature (translunar) was slightly warmer than we would like it, although the gage readings…
  • p. 130 …We had good helium pressure and read that out to MSFN. We went through the RCS…
  • p. 132 …the AGS, and give you an erroneous reading so you wouldn't pass. In any case…
  • p. 134 …There is a bad amount of data that the ground reads up to you in that…
  • p. 151 …They did approach the maximum numbers with a reading of approximately 94. Anyway, they weren't…
  • p. 169 …with time as evidenced by successive LPD readings. FCOD REP. Do you recall when you proceeded…
  • p. 170 …again, although at the time we were reading relatively low tank pressures. I think the OX…
  • p. 172 …We read the sine and cosine out of AGS (and I'm sure they copied that…
  • p. 175 …we were going to launch, so we read through the remainder of the simulated countdown and…
  • p. 235 …same exercises such as pressure-integrity check, reading the cabin down, and configuring the ECS. I…
  • p. 236 …We used a sequence of marking that involved an onboard averaging of five successive cursive readings…
## CONFIDENTIAL

ALDRIN A range rate and a VERB 89. I don't know whether it's of any value; the other guys considered it anyway.

COLLINS I think that thing of watching the S-IVB is just the dealer's choice anyway. There's no need to watch the S-IVB. It's just that if you're going to go to all the trouble of getting the ground to compute three angles with which you should be able to see the S-IVB out a certain window, then you ought to get the correct angles.

## 5.37 EDS DEACTIVATION

COLLINS Nothing to say about that.

## 5.39 S-IVB CLOSEOUT

COLLINS I don't know what to say about that.

## 5.40 DOSIMETER

COLLINS In general, we got very little radiation. Of course, we were going through the Belts about this time. I don't recall that we looked at the radiation-survey meter. Did we do that? Did anybody look at that? I don't believe that was called out. We gave daily dosimeter readings, which as far as I'm concerned fall in a sort of a gee-whiz category. It's just information of very little value to anybody. They have other sources for it, and I suppose it goes on somebody's

## CONFIDENTIAL

About this file

Document, cited by the archive. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 251 pages are in the text index: search them above, or from the library's search.