This is Volume 1 of NASA's Apollo 11 Technical Crew Debriefing, dated July 31, 1969. The Mission Operations Branch of the Flight Crew Support Division at the Manned Spacecraft Center in Houston prepared it, and it was originally classified Confidential. In it Armstrong, Aldrin and Collins go phase by phase through suiting, launch, powered flight, Earth orbit and lunar surface activities. They comment on suit fit, vibration, checklists, lunar dust, footing and poor sleeping conditions in the lunar module. A section titled Visual Sightings appears in the table of contents.

  • p. 22 …COLLINS The only interference I noted was that Neil's suit pocket interfered with the abort…
  • p. 31 …You hand them up and you get the bracket from Neil. It's really sort of…
  • p. 46 …DAP control 5 seconds after spring actuations. Neil and I both read a memo put out…
  • p. 121 …I think that Neil came in just about on schedule. I was able to accomplish three…
  • p. 148 …The way that we found to work out best was for Neil to tell me when…
  • p. 149 ## CONFIDENTIAL soon as Neil would say "MARK", I'd hit ENTER, record NOUN 20. Now the…
  • p. 176 ## CONFIDENTIAL with the EVA and it was sometime in here that Neil called to ground and…
  • p. 185 …The problem was not with mine, but in hooking up Neil's. I can't say…
  • p. 187 …So we unstowed Neil's, and that didn't help immediately. A little later, it seemed…
  • p. 191 …my feet and posterior out the hatch, Neil was in good position, as good as I…
  • p. 196 …In confirmation of Neil's findings, I didn't experience any hot or even warm spots…
  • p. 209 …amount of traverse of this kind. ## ALDRIN Neil initially pulled out about 20 feet of cable…
  • p. 222 …BB was still sitting on the edge. Neil came by with the camera to photograph it…
  • p. 223 …While I proceeded to that — because that's essentially a one-man operation — Neil went around…
  • p. 229 …doubt is a pretty good step, though Neil tells me he got up to the third…
  • p. 231 ## CONFIDENTIAL I had very little difficulty, again using the same technique that Neil used. About half…
  • p. 236 …and then five successive spiral readings that Neil would log down as I would read them…
  • p. 241 …I guess it slipped my mind, perhaps Neil's too, that the Apollo 10 crew had…
  • p. 251 …It was a question of my looking at the LEC, talking to Neil, and hoping we…
## CONFIDENTIAL

PITCH to RATE COMMAND. Then, just as in the simulator, the DAP rolled itself out. It ceased its pitch rate. I don't understand that. At the time, Buzz said that I had forgotten one PROCEED. As I recall, I went through this turnaround procedure exactly as the checklist was written. In the simulator, sometimes it worked like magic and other times it wouldn't. In flight, it worked just exactly like a bad simulator did. MIT or G&C people should check and see what if anything is wrong with this procedure. If I were going to fly this flight over again, I would say it doesn't matter if you pitch up or down. You ought to put those NOUN 22 values in there, hit PROCEED twice, and let the spacecraft turn itself around. You're going to get around within 30 or 45 seconds anyway. It's such a neat, simple, clean, easy procedure to do that way. The way we've got it designed, to make sure that we go pitchup instead of pitch-down, sort of mixes apples and oranges: Let the DAP do it, then you take control away from the DAP, then you give it back to the DAP; and, for reasons unknown to me, sometimes it works and sometimes it doesn't.

I'd say that the manual procedure is probably the best. That would be my preference.