Documents / Document
Apollo 11 Technical Crew Debriefing, Volume 1 (scan)
NASA via ibiblio · 1969-07-31 · 251 pages · text by OCR
This is Volume 1 of NASA's Apollo 11 Technical Crew Debriefing, dated July 31, 1969. The Mission Operations Branch of the Flight Crew Support Division at the Manned Spacecraft Center in Houston prepared it, and it was originally classified Confidential. In it Armstrong, Aldrin and Collins go phase by phase through suiting, launch, powered flight, Earth orbit and lunar surface activities. They comment on suit fit, vibration, checklists, lunar dust, footing and poor sleeping conditions in the lunar module. A section titled Visual Sightings appears in the table of contents.
“Neil”19 pages
- p. 22 …COLLINS The only interference I noted was that Neil's suit pocket interfered with the abort…
- p. 31 …You hand them up and you get the bracket from Neil. It's really sort of…
- p. 46 …DAP control 5 seconds after spring actuations. Neil and I both read a memo put out…
- p. 121 …I think that Neil came in just about on schedule. I was able to accomplish three…
- p. 148 …The way that we found to work out best was for Neil to tell me when…
- p. 149 ## CONFIDENTIAL
soon as Neil would say "MARK", I'd hit ENTER, record NOUN 20. Now the…
- p. 176 ## CONFIDENTIAL
with the EVA and it was sometime in here that Neil called to ground and…
- p. 185 …The problem was not with mine, but in hooking up Neil's. I can't say…
- p. 187 …So we unstowed Neil's, and that didn't help immediately. A little later, it seemed…
- p. 191 …my feet and posterior out the hatch, Neil was in good position, as good as I…
- p. 196 …In confirmation of Neil's findings, I didn't experience any hot or even warm spots…
- p. 209 …amount of traverse of this kind.
## ALDRIN
Neil initially pulled out about 20 feet of cable…
- p. 222 …BB was still sitting on the edge. Neil came by with the camera to photograph it…
- p. 223 …While I proceeded to that — because that's essentially a one-man operation — Neil went around…
- p. 229 …doubt is a pretty good step, though Neil tells me he got up to the third…
- p. 231 ## CONFIDENTIAL
I had very little difficulty, again using the same technique that Neil used. About half…
- p. 236 …and then five successive spiral readings that Neil would log down as I would read them…
- p. 241 …I guess it slipped my mind, perhaps Neil's too, that the Apollo 10 crew had…
- p. 251 …It was a question of my looking at the LEC, talking to Neil, and hoping we…
## CONFIDENTIAL
ALDRIN Yes.
COLLINS The alignment at ORB RATE is no problem as other flights have reported.
4.18 EMS DELTA-V
ARMSTRONG Okay. EMS DELTA V. No problems.
4.19 SCALE CHANGE
ARMSTRONG Scale change, systems, engine alignments, GO for TLI, and then --
COLLINS Glad to get it - no problems.
ALDRIN Well, I think it's worthy to note that we did intend to have the TV camera out. It did not seem to crowd the timeline, trying to get those pictures coming up on the West Coast. We still seemed to have a very comfortable approach to TLI.
COLLINS That's right. Of course, that's where we said we weren't going to fool with the television if we were rushed or behind the timeline.
4.23 DRIFT TEST
ARMSTRONG The drift test has to do with your alignment, I guess. - and also with the GDC drift, which was acceptable.
## CONFIDENTIAL
About this file
Document, cited by the archive. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 251 pages are in the text index: search them above, or from the library's search.