This is Volume 1 of NASA's Apollo 11 Technical Crew Debriefing, dated July 31, 1969. The Mission Operations Branch of the Flight Crew Support Division at the Manned Spacecraft Center in Houston prepared it, and it was originally classified Confidential. In it Armstrong, Aldrin and Collins go phase by phase through suiting, launch, powered flight, Earth orbit and lunar surface activities. They comment on suit fit, vibration, checklists, lunar dust, footing and poor sleeping conditions in the lunar module. A section titled Visual Sightings appears in the table of contents.

  • p. 30 …It was impossible to read an effect on any indicator in the cockpit. COLLINS This is…
  • p. 38 …the expected altitude was 174 and we read 176. The EMS was 3.3 plus. ARMSTRONG…
  • p. 39 …There's no way that the EMS could read 99.1 at docking. As I recall…
  • p. 40 ## CONFIDENTIAL Then I thrusted minus X until the DELTA-V counter read minus 100.5. I…
  • p. 46 …Neil and I both read a memo put out by MPAD, saying that for some failure…
  • p. 50 …We gave daily dosimeter readings, which as far as I'm concerned fall in a sort…
  • p. 51 …COLLINS And the dosimeter we just gave them a once-a-day reading on that dosimeter…
  • p. 68 …When you read me the numbers, you didn't note that I read star number 2…
  • p. 79 …The cabin temperature (translunar) was slightly warmer than we would like it, although the gage readings…
  • p. 130 …We had good helium pressure and read that out to MSFN. We went through the RCS…
  • p. 132 …the AGS, and give you an erroneous reading so you wouldn't pass. In any case…
  • p. 134 …There is a bad amount of data that the ground reads up to you in that…
  • p. 151 …They did approach the maximum numbers with a reading of approximately 94. Anyway, they weren't…
  • p. 169 …with time as evidenced by successive LPD readings. FCOD REP. Do you recall when you proceeded…
  • p. 170 …again, although at the time we were reading relatively low tank pressures. I think the OX…
  • p. 172 …We read the sine and cosine out of AGS (and I'm sure they copied that…
  • p. 175 …we were going to launch, so we read through the remainder of the simulated countdown and…
  • p. 235 …same exercises such as pressure-integrity check, reading the cabin down, and configuring the ECS. I…
  • p. 236 …We used a sequence of marking that involved an onboard averaging of five successive cursive readings…
# CONFIDENTIAL

for the PDI needs additional work prior to the next flight.

There are some alternative methods of understanding platform drift, which we just did not have time to implement. Perhaps the next flights will be able to look at some of these alternatives and decide on an even better method than the Sun check.

## ALDRIN

We turned the propellant quantity on before DOI and I believe the quantity light came on at that point, which was expected as a possibility. Just recycling the switch off and back on again would extinguish the light. The values that we saw in fuel were about 94 and 95, which is what we generally saw in the simulator. The oxidizer value was somewhat lower than that. The simulator values were 95 and 95. I don't believe that there was sufficient time during DOI for these to settle down completely. They did approach the maximum numbers with a reading of approximately 94. Anyway, they weren't dancing around the way we might have been led to expect them to do.

The pre-PDI attitude prevented good S-band high gain contact. We had continual communications difficulty in this area until we finally yawed the spacecraft right