This is Volume 1 of NASA's Apollo 11 Technical Crew Debriefing, dated July 31, 1969. The Mission Operations Branch of the Flight Crew Support Division at the Manned Spacecraft Center in Houston prepared it, and it was originally classified Confidential. In it Armstrong, Aldrin and Collins go phase by phase through suiting, launch, powered flight, Earth orbit and lunar surface activities. They comment on suit fit, vibration, checklists, lunar dust, footing and poor sleeping conditions in the lunar module. A section titled Visual Sightings appears in the table of contents.

  • p. 30 …It was impossible to read an effect on any indicator in the cockpit. COLLINS This is…
  • p. 38 …the expected altitude was 174 and we read 176. The EMS was 3.3 plus. ARMSTRONG…
  • p. 39 …There's no way that the EMS could read 99.1 at docking. As I recall…
  • p. 40 ## CONFIDENTIAL Then I thrusted minus X until the DELTA-V counter read minus 100.5. I…
  • p. 46 …Neil and I both read a memo put out by MPAD, saying that for some failure…
  • p. 50 …We gave daily dosimeter readings, which as far as I'm concerned fall in a sort…
  • p. 51 …COLLINS And the dosimeter we just gave them a once-a-day reading on that dosimeter…
  • p. 68 …When you read me the numbers, you didn't note that I read star number 2…
  • p. 79 …The cabin temperature (translunar) was slightly warmer than we would like it, although the gage readings…
  • p. 130 …We had good helium pressure and read that out to MSFN. We went through the RCS…
  • p. 132 …the AGS, and give you an erroneous reading so you wouldn't pass. In any case…
  • p. 134 …There is a bad amount of data that the ground reads up to you in that…
  • p. 151 …They did approach the maximum numbers with a reading of approximately 94. Anyway, they weren't…
  • p. 169 …with time as evidenced by successive LPD readings. FCOD REP. Do you recall when you proceeded…
  • p. 170 …again, although at the time we were reading relatively low tank pressures. I think the OX…
  • p. 172 …We read the sine and cosine out of AGS (and I'm sure they copied that…
  • p. 175 …we were going to launch, so we read through the remainder of the simulated countdown and…
  • p. 235 …same exercises such as pressure-integrity check, reading the cabin down, and configuring the ECS. I…
  • p. 236 …We used a sequence of marking that involved an onboard averaging of five successive cursive readings…
## CONFIDENTIAL

maneuver. That, I think, is peculiar with the particular landing site, but we were able to get high gain lockon. As a matter of fact, I could have gotten it before we made the pitch maneuver, but it didn't look like there was too much point in doing that.

As soon as we finished the pitch maneuver, we had high gain lockon and had it throughout the yaw maneuver. I was going to take some pictures with the 16-mm camera mounted on the bracket, but it looked like it was canted off to the side.

## ARMSTRONG

No comment at all on using the AGS for this versus the PGNS. We made a change from MAX deadband to MIN deadband. This to me is an open area.

We were in AGS, ATTITUDE HOLD, MIN deadband, and PULSE in the axis that we were maneuvering in. The separation attitude was not the attitude we had expected to be in as a result of some changes to the ephemeris at this point. In other words, Mike was separating on the local vertical, but that was not at the same inertial pitch angle that we expected to be at. It was off by about 10 degrees as I recall.